Background sawep phase 1 (2008 – 2010): Outcome


IRP 8.4 GW new build wind by 2030



Yüklə 461 b.
səhifə3/14
tarix07.01.2022
ölçüsü461 b.
#90742
1   2   3   4   5   6   7   8   9   ...   14

2010 IRP 8.4 GW new build wind by 2030



Support through the Green Power Guarantee Fund at the DBSA that enabled the City of Cape Town to sign a 20 year Power Purchase Agreement with the Darling Wind farm, South Africa’s 1st IPP wind farm and still operating today. The Darling Wind farm broke the ground for other wind IPPs that followed later on and supported through DoE RE IPPPP.

  • Support through the Green Power Guarantee Fund at the DBSA that enabled the City of Cape Town to sign a 20 year Power Purchase Agreement with the Darling Wind farm, South Africa’s 1st IPP wind farm and still operating today. The Darling Wind farm broke the ground for other wind IPPs that followed later on and supported through DoE RE IPPPP.


  • Yüklə 461 b.

    Dostları ilə paylaş:
1   2   3   4   5   6   7   8   9   ...   14




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin