Chapter 1 code of ordinances


CHAPTER 157 AMATEUR RADIO EQUIPMENT



Yüklə 1,42 Mb.
səhifə61/67
tarix17.08.2018
ölçüsü1,42 Mb.
#71552
1   ...   57   58   59   60   61   62   63   64   ...   67

CHAPTER 157

AMATEUR RADIO EQUIPMENT


157.01 Governing Clause

157.03 Permit Required

157.02 Definitions

157.04 Grounding Requirements

157.01 GOVERNING CLAUSE. Poles, masts and towers for supporting antenna used in the operation of amateur radio stations and all equipment used in the operation of non-commercial radio stations licensed by the Federal Communications Commission shall comply with the regulations of this chapter.

157.02 DEFINITIONS. For use in this chapter, the following terms are defined:

  1. “Antenna” means the arrangement of metal rods or pipe used in the sending and receiving of electromagnetic waves. Antenna means a beam, quad, vertical or concave reflector-type antenna.

  2. “Support structure” means any pole, tower, mast or tripod utilized for the purpose of supporting an antenna for the purpose of transmission and reception of electromagnetic waves by Federally licensed amateur radio operators.

  3. “Transmission equipment” means any equipment used to transmit an electromagnetic wave for use in the amateur radio service. All transmitters used on frequencies below 140,000 megahertz shall be equipped with a low pass filter. All transmitters shall be of good engineering design and be properly shielded and grounded.

157.03 PERMIT REQUIRED. It is unlawful for any person to install or construct any antenna support structure without first obtaining a building permit. Application for a building permit shall be made upon forms required by the City and shall have attached the following items:

  1. A copy of the FCC license.

  2. A location plan for the antenna support structure.

  3. Details of footings.

All proposed permit applications shall place notification in a local newspaper in waiver of 500-foot notification ruling (with publication verification being provided to the City).

157.04 GROUNDING REQUIREMENTS.

  1. All antenna support structures, whether ground- or roof-mounted, must be grounded with a minimum of one eight-foot-long copper plated road a minimum of 5/8-inch in diameter and a minimum of number 6 wire used for the conductor from the support structure to the ground rod.

  2. Ground-mounted antenna support structures may be erected only in the rear or side yards. All support structures shall be installed according to manufacturers’ recommended standards.

[The next page is 743]





CHAPTER 158

STORAGE OF FLAMMABLE LIQUIDS


158.01 Purpose

158.02 Bulk Storage Prohibited

158.01 PURPOSE. The purpose of this chapter is to establish rules and regulations governing the storage of flammable liquids, liquefied petroleum gas or other flammable or combustible liquids stored in aboveground tanks within the City in order to protect the public health, safety, and welfare.

158.02 BULK STORAGE PROHIBITED. Bulk storage of flammable or combustible liquids in aboveground tanks or other containers, in excess of twenty-five (25) gallons is prohibited, except as hereinafter provided:

  1. Aboveground tanks may be permitted in the M-1 zoning district, the A-1 zoning district, the C-1 zoning district or the C-2 zoning district, provided that the
    Fire Chief authorizes and the Council approves such placement. However, any bulk storage in the C-1 or C-2 zoning districts shall be limited to storage of liquid propane gas only, with a maximum tank size of 500 gallons, and used for resale to the public only. Any person or entity desiring to store flammable or combustible liquids in the M-1, A-1, C-1 or C-2 zoning districts in excess of 25 gallons shall first apply for a permit through the Fire Chief on a form to be provided by the Clerk. The Fire Chief shall have sixty (60) days to review the application and determine if a permit should be granted. Council approval for such placement is also required. A permit shall be granted by the City only if the aboveground storage tank or other container complies with all applicable local, State or Federal requirements and does not constitute an unacceptable risk to the public health, safety, and welfare, as determined by the City in its sole discretion. In addition, and subject to the restrictions for C-1 and C-2 zoning districts set forth above, tanks may contain no more than 660 gallons of gasoline or 1,100 gallons of diesel fuel, the combination of any tanks, gasoline and diesel, shall not exceed 2,600 gallons on any one property; and no fuel may be used for sale except as set forth above.

  2. Temporary aboveground storage tanks used for construction projects may be allowed in any zoning district of the City, but before placement must first receive a permit from the Fire Chief. To obtain a permit, the applicant shall file an application in writing on a form furnished by the City for that purpose. Each such application shall identify the size of the tank required, the material composition of the tank, the reason the tank is needed, the length of time it will remain at the site, a description of the location at which the tank will be placed, and a map showing the distances from the tank to buildings and lot lines.

[The next page is 749]




CHAPTER 159

WIND ENERGY CONVERSION SYSTEMS


159.01 Purpose

159.06 Regulations

159.02 Definitions

159.07 Minimum System Design Standards

159.03 Commercial Wind Energy Conversion System

159.08 Application Process

159.04 Special Accessory use

159.09 Collection of Costs

159.05 Public Notification




159.01 PURPOSE. The purpose of this chapter is to allow safe, effective, and efficient use of small wind energy conversion systems; to identify locations in areas of the City which may be least adversely impacted by the visual, aesthetic, and safety implications of their location.

159.02 DEFINITIONS. For use in this chapter the following terms are defined:

  1. “Blade” means an element of a wind turbine which acts as a part of an airfoil assembly, thereby extracting through rotation, kinetic energy directly from the wind.

  2. “Commercial wind energy conversion system” means a wind energy conversion system which is intended to produce electricity for sale to a rated regulated or non-regulated utility or for use off site.

  3. “Height, total system” means the height above grade of the wind energy system, including the tower generating unit, and the highest vertical extension of any blades or rotors. Height shall be measured from the adjacent grade of the tower to the tip of the turbine (blade) at its highest point.

  4. “Shadow flicker” means alternating changes in light intensity caused by the moving blade of a wind power generator casting shadows on the ground and stationary objects such as the window of a dwelling.

  5. “Small wind energy conversion system” means a wind turbine, a tower, and associated control or conversion electronics, which is intended to reduce on-site consumption of utility power, is incidental and subordinated to a permitted use on the same parcel and has a rated capacity of up to one hundred (100) kilowatts. No roof-mounted wind energy conversion system shall be allowed.

159.03 COMMERCIAL WIND ENERGY CONVERSION SYSTEM. It is unlawful to erect or maintain a commercial wind energy conversion system within the City of Cresco.

159.04 SPECIAL ACCESSORY USE.

  1. Special Use. A small wind energy conversion system may be allowed only as an accessory use to a permitted principal use and shall require approval of a special use permit from the Board of Adjustment prior to construction, installation, alteration, or location of such structure.

  2. Permit Required. It is unlawful to construct, erect, install, or alter or located any small wind energy conversion system within the City of Cresco, unless a special use permit has been obtained from the Board of Adjustment. The permit may be revoked at any time the approved system does not comply with the regulations, and



  1. rules established herein and any additional conditions imposed by the Board. The owner of the system shall also obtain all other permits or licenses required by Federal, State, and local agencies prior to construction of the system.

159.05 PUBLIC NOTIFICATION. Following receipt of the application for special use permit, the Board of Adjustment shall meet. Notice will be sent to the surrounding property owners within 1,000 feet of the property having the site plan considered. Notice shall be sent not less than seven (7) days and not more than twenty (20) days prior to the meeting at which the application is first considered. The notice shall contain the date, time and location of the meeting.

159.06 REGULATIONS.

  1. Minimum Lot Size. No small wind energy conversion system shall be constructed on a lot smaller than three (3) acres.

  2. Minimum Setback Requirements. All small wind energy conversion systems shall have a setback of 110% of the total system height from any property line.

  3. Maximum Height. The maximum tower height for a small wind energy conversion system shall be 60 feet.

  4. Number of Systems Allowed. No more than one small wind energy conversion system shall be allowed on any parcel.

  5. Location.

  1. A wind energy conversion system shall not be located in any required setback.

  2. A wind energy conversion system shall be located entirely in the rear of the property.

  3. No part of a wind energy conversion system shall be located within or over drainage, utility or other established easements, or on or over property lines.

  4. A wind energy conversion system shall be in compliance with the guidelines of the Federal Aviation Administration (FAA) regulations.

  5. No wind energy conversion system shall be constructed within 20 feet laterally of an overhead electrical power line (excluding secondary electrical service lines or service drops). The setback from underground electric distribution lines shall be at least five feet.

  6. All wind energy conversion systems shall be located a minimum of 1,000 feet from the nearest inhabited residential structure, school, hospital, or place of worship not on property owned or controlled by the owner/operator of the wind energy system. This setback can be reduced at the discretion of the Board of Adjustment based upon the shadow flicker model provided.

  7. All wind energy conversion systems shall be located a minimum of 1,000 feet from the nearest wind energy conversion system located on another parcel.

  8. No roof-mounted small wind energy conversion system shall be allowed.

159.07 MINIMUM SYSTEM DESIGN STANDARDS. The following standards are required of all small wind energy conversion systems and shall be deemed to be conditions of approval for every wind energy system.

  1. Color. The wind energy conversion system shall be white or light gray in color. Other neutral colors may be allowed at the discretion of the Board of Adjustment. The surface of the structure shall be non-reflective.

  2. Lighting. No lights shall be installed on the tower, unless required by the Federal Aviation Administration (FAA).

  3. Signs. One sign, limited to four (4) square feet, shall be posted at or near the base of the tower. The sign shall include a notice of no trespassing, a warning of high voltage, and the phone number of the property owner to call in case of emergency. Such sign shall be directly visible from any external fencing and/or landscaping. Brand names or advertising associated with any installation shall not be visible from any public right-of-way.

  4. Clearance of Blade Above Ground. No portion of the wind energy conversion system shall extend within 20 feet of the ground. No blades may extend over parking areas, driveways or sidewalks.

  5. Installation. Installation must be done by a qualified professional and according to manufacturer’s recommendations.

  6. Noise. A noise study must demonstrate that the wind energy conversion system shall not exceed 65 decibels (dBA) within 100 feet of the wind tower, except during short-term events such as severe wind storms or utility outages.

  7. Use of Electricity Generated. A wind energy conversion system shall be used exclusively to supply electrical power for onsite consumption by the principal structure only. When a parcel on which a wind energy conversion system is installed also receives electrical power supplied by a utility company, excess electrical power generated by the wind energy conversion system and not presently needed for on-site use may be used by the utility company in accordance with Section 199, Chapter 15.11(5) of the Iowa Administrative Code.

  8. Automatic Over Speed Controls. All wind energy conversion systems shall be equipped with manual and automatic over speed controls to limit the blade rotation speed to within the design limits of the wind energy conversion system.

  9. Electromagnetic Interference. All blades shall be constructed of a nonmetallic substance. No wind energy conversion system shall be installed in any location where its proximity with existing fixed broadcast, retransmission, or reception antenna for radio, television, or wireless phone or other personal communication systems would produce electromagnetic interference with signal transmission or reception. No wind energy conversion system shall be installed in any location along the major axis of an existing microwave communications link where its operation is likely to produce electromagnetic interference in the link’s operation.

  10. Interconnection. The wind energy conversion system, if interconnected to a utility system, shall meet the requirements for interconnection and operation as set forth by the utility and the Iowa Utilities Board.

  11. Wind Access Easements. The enactment of this section does not constitute the granting of an easement by the City. The owner shall provide covenants, easements, or similar documentation to assure sufficient wind to operate the wind energy conversion system unless adequate accessibility to the wind is provided by the site.

  12. Shadow Flicker. A shadow flicker model must demonstrate that shadow flicker shall not fall on, or in, any existing residential structure. Shadow flicker expected to fall on a roadway or a portion of a residentially zoned parcel may be acceptable if the flicker does not exceed 30 hours per year, and the flicker will fall more than 100 feet from an existing residence; or the traffic volumes are less than 500 vehicles on the roadway.

  1. Map and describe within a 1,000-foot radius of the proposed wind energy system the topography, existing residences, and location of their windows, locations of other structures, wind speeds and directions, existing vegetation and roadways. The model shall represent the most probable scenarios of wind constancy, sunshine constancy, and wind directions and speed.

  2. Calculate the locations of shadow flicker caused by the proposed project and the expected durations of the flicker at these locations, calculate the total number of hours per year of flicker at all locations.

  3. Identify problem areas where shadow flicker will interfere with existing or future residences and roadways and describe proposed mitigation measures, including, but not limited to, a change in sitting of the wind energy conversion system, a change in the operation of the wind energy conversion system, or grading or landscaping mitigation measures.

  1. Appearance. The owner of any wind energy conversion system shall maintain such system in a safe and attractive manner, including replacement of defective parts, painting, cleaning, and other acts that may be required for the maintenance and upkeep of the function and appearance of such a system. The owner shall maintain the ground upon which the system is located in an orderly manner, such that it is free of debris, tall grass and weeds, and any structures remain quality in appearance.

  2. Insurance. The owner of a wind energy conversion system shall maintain $1,000,000.00 liability insurance as a condition of obtaining a permit and shall file a copy of said insurance policy with the City. Upon granting of a permit, the owner shall assume full responsibility for any and all damages, claims, expenses, liabilities, judgments and costs of any kind, including reasonable attorney’s fees related to or caused by the erection, location, use or removal of a facility, and shall agree to hold the City harmless, indemnify and defend it from all such liabilities incurred or judgments entered against it as a result of the erection, location, use or removal of the facility.

  3. Removal. Any wind energy conversion system that remains non-functional or inoperative for a continuous period of 180 consecutive days shall be considered abandoned and shall constitute a public nuisance. Within the next 180 days, after notice from the City, the owner shall reactivate the tower or it shall be dismantled and removed at the owner’s expense. Removal of the system includes the entire structure, including foundations, transmission equipment and fencing from the property.

  1. Non-function or lack of operation may be proven by reports from the interconnected utility. The owner and successors shall make available to the City all reports to and from the users of energy from the wind energy system if requested.

  2. If removal of tower and appurtenant facilities is required, the City Council shall notify the owner. If the City removes a tower and appurtenant facilities, it may sell the salvage to defray the cost of removal. Further, the City may collect any remaining costs of removal from the owner of the wind energy conversion system or owner of the ground upon which it is located. The City Clerk shall send a statement of the total expense incurred to the property owner who has failed to abide by the notice. If the amount shown by the statement has not been paid within one (1) month, the Clerk shall certify the costs to the County Treasurer and such costs shall then be collected with, and in the same manner as, general property taxes.

  3. The Board of Adjustment can revoke a wind energy conversion system permit at any time if the requirements set forth in this chapter and/or any conditions imposed by the Board are not met.

  1. Right of Entrance. By the acceptance of a permit, the owner grants permission to the City, to enter on the property to remove the tower and all fixtures pursuant to the terms of the permit and to assure compliance with the conditions set forth in the permit.

  2. New Technologies. Should new technology present itself within the term of any permit or lease that is more effective, efficient, and economical, the permit holder may petition the City to allow the upgrade, provided the upgrade does not alter the conditions set forth in this chapter.

  3. Engineer Certification. Application for wind energy conversion systems shall be accompanied by standard drawings of the wind turbine structure, including the tower, base, and footings. An engineering analysis of the tower showing compliance with the application regulations and certified by a licensed professional engineer shall also be submitted.

  4. Utility Notification. A wind energy conversion system shall not be installed until evidence has been given that the utility company has been informed of the customer’s intent to install an interconnected customer-owned generator.

  5. Inspections. At least every 24 months, every tower shall be inspected by a qualified professional who is regularly involved in the maintenance, inspection and/or erection of wind energy conversion systems. At a minimum, this inspection shall be conducted in accordance with the inspection checklist provided in the Electronics Industries Association (EIA) Standard 222, Structural Standards for Steel Antenna Towers and Antenna Support Structures. A copy of the inspection record shall be provided to the City.

  6. Ice Shedding. Wind energy conversion system owners shall ensure that ice from the rotor blades does not impact any off-site properties.

  7. Climbing Apparatus. All climbing apparatuses must be located twelve (12) feet from the ground and the tower must be designed to prevent climbing within the first 12 feet.

  8. Fencing. All wind energy conversion systems and associate guy wire anchor points shall be enclosed by a six-foot-high opaque fence with smooth side to the outside, no more than one-inch gaps, and a securely locked gate to limit uncontrolled access and reduce safety hazards.

159.08 APPLICATION PROCESS. All applicants who wish to locate a wind energy conversion system must submit to the City’s Board of Adjustment, on the forms provided by the City, a plan including the following information:

  1. Complete property dimensions.

  2. Location and full dimensions of all buildings existing on the property where the system is to be located, including exterior dimensions, height of buildings, and all uses on the property.

  3. Location and dimensions of any natural or manmade features within 1,000 feet of the property, such as trees, ridges, highways, street, bridges and underpasses.

  4. Location of all easements upon the property where the system is to be located.

  5. Proposed location of tower, including height and setbacks from property lines.

  6. Drawings, to scale, of the structure, including the tower, base, booting, and guy-wires, if any, and electrical components. The drawings and any necessary calculations shall be certified by a licensed engineer.

  7. Certification from a licensed engineer or qualified professional that the rotor and over speed controls have been designed for the proposed use on the proposed site.

  8. Evidence that the proposed wind energy conversion system model has an operational history of at least one year.

  9. Evidence that the applicant has notified the utility that the customer intends to install an interconnected customer-owned generator, and that the generator meets the minimum requirements established by the utility and the Iowa Utilities Board. Off grid systems are exempt from this requirement.

  10. Evidence that the wind energy conversion system does not violate any covenants of record.

  11. Evidence from a qualified professional that the site is feasible for a wind energy conversion system, or that covenants, easements, and other assurance to document sufficient wind to operate the wind energy conversion system have been obtained.

  12. Evidence that the proposed wind energy conversion system will comply with applicable Federal aviation regulations, including any necessary approvals from the Federal Aviation Administration (FAA).

  13. Evidence that the applicant can obtain and maintain adequate liability insurance for the facility.

  14. A noise study.

  15. A shadow flicker model.

  16. Any other evidence or information as required by the Board of Adjustment.

159.09 COLLECTION OF COSTS.

  1. A fee of $250.00 shall be submitted with the application.

  2. Any additional costs incurred by the City regarding review of plan submitted with a permit application will be paid in full by the applicant.

[The next page is 765]







Yüklə 1,42 Mb.

Dostları ilə paylaş:
1   ...   57   58   59   60   61   62   63   64   ...   67




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin