B.2.Applicability of methodology

The choice of methodology ACM0002 version 15 is justified as the proposed project activity meets its applicability criteria:


• Mut WPP is a grid-connected renewable power generation project activity that is a new wind power plant at a site where no renewable power plant was operated prior to the implementation of the project activity (Greenfield plant);
• The project does not involve switching from fossil fuels to renewable energy at the site of the project activity