Project description:
The objective of the project was to develop a tool, that based on various parameters could point out the water mains in the distribution network which should be given priority for rehabilitation in water mains rehabilitation plans.
An important target for the project was that it should be feasible and easy to implement. The tool should, as far as possible be based on easily available data. Further data acquisition or digging for hardly available information in old archives should be limited to a minimum.
The software tool should focus primarily on the water distribution network, leaving out coordination with sewer, road works or other infrastructure initiatives.
It was decided that the tool should be tightly connected to the GIS system, as this is the database from where most information easily can be withdrawn.
The time frame for the project was:
June – November 2007 Preliminary study
Spring 2007: Tendering for acquisition of IT / civil eng. consultant
June 2008: Project start
September 2008: Prof of concept model
November 2008: First version model
January 2009: Sensitivity test and test on pilot zone
February 2009: Final project report and acceptance.