BaTCoDA

0735 DELIVERY & STORAGE

The proposed methods of the storage and handling of carpentry & joinery posts and timber requires the specific approval of the Engineer.


Timber & posts shall be purchased at the contractors expense immediately after taking over site and are to be open stacked off the ground for as long as possible before use.
Timber and posts shall be protected from exposure to excessive humidity and sunshine.
Timber and posts shall be stored in a manner that would protect them from attack by termite, insect and decay.

In addition to the above requirement, seasoned timber shall be stacked in roofed and walled enclosures to minimize variation in moisture content beyond the acceptable limits.


Panel boards & assembled joinery shall be neatly stacked in an enclosed space in a manner ensuring no damage to the panels and assembled work caused by stacking weight and variations in temperature & humidity.
Fixed joinery liable to be bruised or damaged in any way, shall be completely protected until the completion of the construction. Exposed and finished items shall be removed and or loosened and protected while decoration work is being carried out and re-fixed afterwards.

0736 Samples

Samples of each type of work in its component material, fabricated, assembled fixed and finished forms shall be produced as required for approval by the Engineer.


All materials and work thereafter shall in all respects, comply with the approved samples. Samples shall be maintained and kept in their original condition until permission to remove them is granted by the Engineer.

Yüklə 475,5 Kb.

Dostları ilə paylaş:
1   ...   100   101   102   103   104   105   106   107   ...   249




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin