General requirements



Yüklə 475,5 Kb.
səhifə186/249
tarix22.02.2022
ölçüsü475,5 Kb.
#114634
1   ...   182   183   184   185   186   187   188   189   ...   249
BaTCoDA

124 EXECUTION
1241 General

Materials shall be prepared, mixed and applied in strict conformity with the manufacturer's instructions and as approved by the Engineer.


Materials shall be well stirred before application to produce a mixture of uniform density as required during the application.
No painting shall be carried out when rain, fog, condensation is likely to occur, the relative humidity exceeds 85% or the surface to receive paint or primers is damp.
1242 Surface Preparation & Paint Application
12421 General

All work on which painting is to be applied shall be inspected for satisfactory installation to enable painting to start.

Surfaces to receive paint shall be cleaned of all oil, grease, and loose and powdery material. Surfaces to receive paint shall be sufficiently dried before the application of the paint.
All removable items fixed on surfaces to receive paint, but not receiving paint shall be removed before application and re-installed after completion of work.


Yüklə 475,5 Kb.

Dostları ilə paylaş:
1   ...   182   183   184   185   186   187   188   189   ...   249




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin