1516 TESTING OF COMPLETED INSTALLATION
Site testing of the general electrical installation shall be carried out on completion of the works, on completion of sections of the works, or at any time as requested by the Engineer. This test shall be witnessed and three copies of Test Certificates giving the results of the tests shall be submitted.
The following tests shall be carried out in accordance with the requirements of EELPA.
Insulation resistance tests between phases and each phase to earth.
Earth continuity tests on all circuits.
Earth resistance of earth electrodes.
Line and neutral earth loop impedances from selected positions on site.