Summary: Proposing a method of defining the optional features of parts, creating an extensive table of the features and cross checking the existence of each option per feature against the existing conformance vectors and reference software to identify the gaps.
Resolution:
Updated the work plan.
The ad-hoc will have the mandate to complete the coverage map by the next meeting:
Thomas/Waqar (Qualcomm) to fill the feature list in the table
Christian/others study the completeness, and to what extend is supported in existing Part 2 documentation and software
Waqar writes and runs the scripts to generate the coverage of test vectors.
Everyone review and provide feedback.
Volunteers:
MPD: Cyril,
ISOBMFF: Cyril, Ingo, Iraj, Kilroy,
M2TS: Alex, Comcast, CableLabs
m32317 Updated reference software for ISO/IEC 23009-4
Disposition: Accepted. To be included in Part 2 2nd Ed WD.
Summary: Conformance software for Part 2. Separate executable from existing Part 2. No test vectors yet. Needs to be checked in terms of coverage and completeness. Needs also conformance vectors. Expected to be completed in the next meeting.
Resolution:
Check and include in Part2 2nd Ed WD at this meeting.
Huawei will check the completeness and conformance (with help from Alex).