Project Title
-
Introduction of construction team, sign attendance sheet
Obtain E-mail addresses, cell phone numbers, and home numbers in case of emergencies
Contractors’ representatives; , Project Manager, (c) , Superintendent, (c) , Superintendent, (c)
Architects/Designers representatives; , Architect (c) , Architect (c) , Engineer (c) , Engineer (c)
Owner/GT Facilities representatives; , Construction Mgr. (c) (e-mail) , GT Architect (c) (e-mail) , Facilities Zone Mgr.(c) (e-mail) , Building Manager (c) (e-mail) , Facilities U&E Mgr.(c) (e-mail)
-
Discuss any addenda / RFIs
a. Addendum 1
b. Addendum 2
-
Review areas of responsibility - Discuss:
-
GT’s Construction Manager’s role – general administration of contract
-
Design Professional’s role – review RFIs, application for payment,
-
Submittal flow – shop drawings, Schedules, samples, substitutions
-
Review schedule - Discuss: Contractor to have preliminary Schedule prepared for meeting
-
specific milestones – Contractor to have Schedule of Values for meeting
-
work hours – Saturday/Sunday shutdowns
-
quiet time
-
notice to proceed
-
Equipment/material ,delivery - (GT furnished equipment?)
-
Review submittal procedures – Discuss,
-
Submittal log - required? format for log
-
Long lead items
-
Submittals requiring special review (transformers, fire protection, etc.) -
-
Change orders – Discuss,
-
Authority to change work
-
RFI- request for information
-
RFP-request for proposal
-
Proposal format
-
Approval and modification issuance
-
Safety – Discuss,
-
Responsibility for safety is solely the Contractor’s
-
Access barriers
-
Digging permits/underground utilities-location
-
Existing environmental conditions
-
OSHA jurisdiction
-
Fire Alarm System shutdowns are to be coordinated w/ GT CM
-
Fire Alarm Watch – GC to provide FA manual monitoring while system is shut down.
-
Burn Permits
-
Fire Marshall Certificate of Occupancy
-
No guns on campus
-
Site Access - Discuss
-
Lay-down and storage area
-
Trash – dumpster vs. small dump truck
-
Erosion control plan
-
Need and lay-down area for construction trailer
-
Keys to specified facilities
-
Passes or DJ's
-
Vehicle parking permits
-
Bathroom facilities
-
Utility access (gas, electric, water usage and metering)
-
Signage – pedestrian routing, construction zone, hard hat area
-
Identify project specific considerations
-
Notifications - Identify proper individuals with authority to notify of :
-
Utility interruptions and system shutdowns – 2 weeks notice
-
Exterior work requires a utilities locate - GT & outside utilities
-
Work times
-
Parking disruptions
-
Pedestrian access/routing disruptions
-
Noise levels - academic considerations
-
Identify project specific considerations
-
Disposal and Salvage
-
Identify any Georgia Tech property to remain or to be salvaged
-
Contractor is responsible for disposal of refuse and debris in compliance with Federal, State, local requirements.
-
Coordinate with Surplus to have furniture items removed
-
Payment Procedures
-
Monthly payments
-
Retainage - 10% standard, out-of-compliance work, behind schedule
-
Process time
-
Letter of Condemnation
-
Final Invoice and Payment
-
final inspection complete
-
punch list complete
-
all O&M manuals submitted
-
as-builts submitted
-
Correspondence
-
E-mail addresses, preferred form of correspondence and communication
-
Fax numbers and procedures
-
Telephone numbers (direct lines, cell numbers, home #'s, emergency contact #'s)
-
Daily Reports – required? Not required?
-
Existing Conditions -
-
Contractor to perform jobsite cleanup on a daily basis, especially in occupied areas.
-
Contractor to provide protection for all existing materials, surfaces, equipment, etc. to remain throughout construction period.
-
Take pictures of existing areas, sidewalks, curbs, etc. for exterior work to document existing conditions.
-
GT list of departments to coordinate:
-
Zone Managers
-
Building Managers
-
U&E
-
EH&S
-
Police
-
Parking
-
Transportation – Tech Trolley,
-
Buzzcard
-
Landscape
-
OIT
-
Fire Alarms