Table 1: summary of transit signal priority deployment results



Yüklə 359,2 Kb.
səhifə37/38
tarix03.01.2022
ölçüsü359,2 Kb.
#46822
1   ...   30   31   32   33   34   35   36   37   38

6.0 Record Keeping


The Vendor shall assist the VDOT in meeting any reporting requirements that may be imposed for the granting or continuation of funding from local, regional, commonwealth or federal authorities. The Vendor shall retain records required by this contract for a period of four years from the conclusion of this contract.

In Vehicle Device

Detector/Reader

Interface

Exhibit A: A Generic Description of the Emergency Vehicle Preemption and Transit Priority System






Exhibit B: U.S. Route 1 Test Area

Legend
Fire Station Number 11

Signalized Intersections

Richmond Highway is also U.S. Route 1




Exhibit 11: An Evaluation Process*


Source:

Casey R., F. and Collura, J., Advanced Public Transportation Systems: Evaluation Guidelines, Final Report, Advanced Public Transportation Systems Program, Office of Technical Assistance and Safety, U.S. Department of Transportation, January 1994.




Yüklə 359,2 Kb.

Dostları ilə paylaş:
1   ...   30   31   32   33   34   35   36   37   38




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin