100 general provisions



Yüklə 7,65 Mb.
səhifə107/108
tarix18.01.2019
ölçüsü7,65 Mb.
#100759
1   ...   100   101   102   103   104   105   106   107   108

steel box culverts 431

steel underdrains 449

Corrugated polyethylene drainage pipe 433

Corrugated polyethylene drainage tubing 449

Corrugated polyethylene smooth lined pipe 431, 432, 449, 768

Corrugated steel box culverts 763

Corrugated steel pipe and pipe arches 431

Bituminous coated 431

Cover aggregate 213

Covering of signs 475

Covering of vehicular signal head 549, 551

Cribs 286, 289, 290

Crushed aggregate walks 459

Culvert 7, 444, 653, 741

Removed 82

Curb 643


Markings 581

Curbing 460

Materials 460

Curing and loading, structural concrete 318

Curing compounds 395

Curing concrete barrier 502

Cut-back asphalt 682

Cutting, in sleeve, valve and valve box 902

Cylinders, concrete 311

Dead trees 634

Deep beam rail 398

Deep pipe underdrains 448, 449, 452

Deflection of falsework 300

Delineators 496

Flexible posts 497

Materials 496

Rectangular reflectors 496

Removal, storage and disposal 497

Rectangular reflectors 496

Depositing structural concrete under water 316

Detector loop signal 545

Dial 888


Differing site conditions 16

Dimensions, verification of, structures 279

Disconnect switch

For traffic signals 549, 850

Disposal of excavated material 288

Disqualification of bidders 14

Ditches, construction of 91

Dotted lines 577

Dowel bars 142, 152, 250, 501

Dowel holes 257, 307, 308

Materials 307

Placement 308

Down guy 541, 552, 849

Drain tile

Clay 754

Concrete 754

Drainage of structures

Excavation 400

Fabrication 399

Materials 399

Removed 85

Scuppers 400

Drainage of subgrade 91

Drains 118, 430, 448, 451, 452, 604, 605, 798

Drift pins, structural steel 349, 357, 408

Drilled shafts

Friction type 413

Drilled shafts, for construction

Friction type drilled shafts 413

Drilled shafts, for structures

Dry construction method 412

Excavation inspection 415

Hole excavation 412

Inspection records 418

Materials 411

Permanent casing construction method 413

Reinforcing steel 416

Slurry 414

Temporary casing construction method 413

Wet construction method 413

Drilling and blasting in rock cuts 121

Driving, of piles 291

Drums 486

Reflectorized sheeting 474

Ductile iron pipe, joints, and fittings 565, 900

Dust control 490

Duties 23, 362

Inspector 23

Dynamic load test for piles

Equipment 410

Test procedures 410

Earthwork 87, 96, 488, 604, 605

Limitations of operations 113

Edge lines 480, 580

Electrical signs 828

Eliminated items 18

Embankment 2, 87, 88, 89, 92, 93, 97, 99, 100, 104, 105, 106, 107, 430, 441, 469, 605, 606, 641, 642, 649, 704, 705

Areas inaccessible to rollers 95

Definition of 88

Granular material 97

Moisture control 95

Random material 94

Suitable material 88

Compaction 87, 88, 95, 96, 100, 103, 104, 157, 158, 159, 167, 176, 235, 238, 243, 427, 429, 442, 459, 690

Emergency, structural concrete placement 316

Emulsions 53, 207, 646, 679, 682

Engineer

Authority of 20

Entrained air structure 274

Environmental protection measures 84, 90

Environmental protection, responsibility for 41

Epoxy coated, reinforcing steel 302

Equipment 7, 36, 46, 62, 63, 64, 65, 66, 70, 123, 140, 145, 146, 148, 150, 153, 163, 165, 167, 173, 196, 198, 204, 207, 208, 211, 212, 217, 218, 250, 264, 274, 291, 326, 332, 359, 364, 383, 386, 409, 410, 469, 471, 507, 515, 516, 517, 535, 536, 540, 541, 549, 554, 564, 570, 576, 577, 582, 585, 587, 593, 598, 643, 730, 835, 859, 861, 864, 870, 881, 882, 887

Erection procedures

Plate girders 344, 353

Erosion control mats 636

Examination of plans, specifications, special provisions and site work 11

Excavation 25, 35, 45, 88, 91, 97, 99, 104, 133, 286, 287, 288, 289, 290, 399, 400, 409, 410, 411, 412, 415, 429, 435, 445, 447, 449, 451, 458, 459, 466, 468, 469, 564, 565, 566, 571, 642

Additional 290

Definition of 88

Disposal 88

Rock 101


Excavation for structures

Classification 286

Cofferdams, cribs, and sheeting 286

Execution of contract 16

Expansion and Contraction Joints, Joint Sealers, and Bearing Devices

Fabrication 394

Materials 395

Expansion joints, structure

Preformed 395

Sliding plates 396

Expansion rockers 396

Expansion shield anchors 142, 456

Explosives 119, 120

Fabric for waterproofing 793

Fabrication, structural steel 352

Fabricator 4, 7, 279, 280, 284, 339, 340, 341, 342, 382, 383, 384, 662, 663

Approval of 279

Failure to execute contract 16

Falsework and forms, structures

Camber 300

Deflection 300

Forms 301

Removal 301

Federal-Aid provisions 32

Fence 455

Chain link 456, 780

Clearing and grading 456

Fabric 457

Hardware 780

Post assemblies 456

Removed 85

Steel posts, gates, frames, braces 781

Woven steel wire 457

Barbed wire 456

Fabric 104, 116, 118, 119, 337, 400, 401, 430, 455, 457, 659, 660, 778, 779, 783, 793

Woven steel wire 456

Fertilizer

Commercial 602

Fertilizing 628, 638

Fiber bounded bituminous coated corrugated steel pipe and pipe arches 760

Field splices, structural steel 357

Fillers, preformed 395

Filter fabric 115, 399, 421, 424, 448, 450

Fine aggregate 146, 264, 276, 403, 690, 694, 695, 696, 697

Fine grading, of subbase/ subgrade, PCC 252

Finishing machine 321, 462

Finishing, patched concrete structure 402

Fire hydrant 903

Fire hydrant adjusted 572

Flagger 475

Flasher controller 555, 557, 884

Flasher, for traffic signal controller 864

Flexible delineator posts 803

Flexible plastic gaskets, for concrete pipe 756

Footings in rock 288

Forms 250, 259, 299, 302, 310, 318, 386, 458, 459, 462, 463, 501

Oiling 302

Proposal 11

Removed 318

Foundation 517, 520, 534, 551, 553, 563, 564, 901

Approval of 288

Traffic signal controller 557

Full depth rigid pavement removal and flexible replacement

placement of asphalt concrete 137

Removal of existing pavement 137

Subgrade 137

Full depth rigid pavement removal and rigid replacement

Correction of subbase or subgrade 143

Opening to traffic 144

Placement of portland cement concrete 143

Removal of existing pavement 142

Subbase 143

Wearing Course Replacement 144

Functional test 550

Galvanized steel 295, 779

Railing 398

Galvanizing 453, 660, 780

Gate valve and valve box 565, 902

General concrete

Materials 704

Geotextile fabrics 113, 114, 797

Glass beads 576, 577, 582, 585, 586, 587, 593, 594, 596, 599, 893, 895, 896, 897, 898, 899, 900

Granular material, definition of 88

Granular material, for embankment 89

Granulated slag 161

Gravel 181, 202, 203, 266, 267, 268, 271, 272, 273, 694, 695, 696, 697, 698, 699, 700, 701, 705, 706, 707, 710, 711, 715, 717

Grease, multipurpose 755

Grid 520


Ground bus bars, signal controllers 884

Ground granulated blast furnace slag, PCC 272

Grounding 507, 513, 515, 520, 868

Grout 145, 147, 307, 308, 320, 652, 695, 721

Non-shrink, non-metallic 721

Guard posts 785

Guardrail 453

Bridge terminal assembly 455

Deep beam rail 453, 784

Erecting rail elements 453

Galvanizing 453

Material 453, 780

Temporary 488

Deep beam rail 453

post 453

Pressure treated 453

Handhole cover, sign supports 523, 825

Handling, measuring and batching PCC 275

Hardware, signs 825

Hauling, Flexible pavements 172

High early strength 266

High early strength concrete 266, 324

Achieving 266

Structures 311

Highway lighting

Cable 547

Duct-cable 519

Ground grid 518

Junction box 518

Holes, for dowels 308

Horizontal deflection, fence 456

Hot applied sealer, crack and joint 719

Hydraulic cement

Air-entraining, portland 678

High early strength portland 678

Masonry 678

Portland 678

Identification 129, 355, 509, 543, 702

Incidentals 507, 508

Inlets 446, 447, 448

Precast 437

Inoculating bacteria 611

Inserting valve box 902

Inspection 3, 23, 39, 41, 75, 91, 103, 260, 351, 355, 356, 360, 363, 366, 379, 380, 382, 383, 386, 403, 407, 411, 415, 418, 447, 448, 523, 531, 535, 538, 567, 628, 629, 641, 667

Final 75

Inspection and testing, pneumatically placed mortar 407

Inspection wells 447

Inspector 2, 7, 23, 24, 39, 53, 59, 75, 76, 362, 363, 368, 370, 371, 373, 374, 376, 381, 586, 597

Authority and duties 23

Installation of

Barrier reflectors 521

Delineators 497

Insulating concrete 318

Intent of contract 16

Internally illuminated signs 538, 830

Island marking 581

Job mix formula, asphalt concrete 223

Job mix formula, development 155

Joint 12, 200, 250, 254, 257, 260, 330, 394, 395, 397, 419, 421, 430, 643, 651, 719, 720, 755

Construction 263

Longitudinal 254, 256

Sealer 250, 395, 419, 421

Joint filler, bituminous pipe 755

Junction boxes 518

Junction chambers 446

Labor, extra work 60

Laboratory dry weight, definition of 88

Lamps 541, 667, 672, 807, 834, 835

Incandescent 672, 834, 844

Mercury 536, 539, 671, 828

Signal 3, 540, 541, 543, 544, 546, 549, 551, 552, 553, 554, 643, 644, 672, 673, 832, 833, 834, 835, 838, 840, 843, 844, 847, 853, 859, 866, 870, 872, 873, 881, 882

Lateral bracing 348

Law enforcement officer 475

Laws to be observed 39

Laying water mains 567

Layout 478, 496, 497, 498, 503, 505, 520, 521, 576, 579, 587, 590, 591, 592, 628, 629

Layout of barrier reflectors 521

Layout of delineators 497

Layout, trees, shrubs, and vines 629

Leaded bronze 358, 790

Legal relations and responsibility to public 31

Legal rights, no waiver of 41

Lifting sod 626

Light pole 518

Lighting 486, 487, 507, 516, 520, 644, 814, 822

Lightning protection device, traffic signal controller 865

Lime Modified Soil

Compacting 106

Contractor Designed Lime Soil 106

Mixing 106

Lime soil stabilized subgrade

Compaction and mixing 109

Materials and spreading 108

Limitation of operations 46

Line marking descriptions, RPM 474

Line placement tolerance, pavement marking 579

Line post, fence 456, 784, 785

Line types, pavement markings 579

Linear grading 134

Liquid membrane-forming compounds 720

Load restrictions 24

Loading concrete 311

Local traffic 472

Location and source, trees, shrubs, and vines 629

Loop detector unit 551, 846, 865

Delay and extension type 847

NEMA TS-2 847

Lot acceptance 193, 194

Low strength mortar backfill 469

Equipment, placing 471

Materials, proportioning 469

Mix adjustment, alternates 470

Lumber 661, 663, 793, 796

Luminaire 507, 508, 516, 517, 520, 532, 534, 535, 538, 539, 540, 667, 668, 671, 804, 817, 819, 828

Magnetometer detector unit 551, 847

Magnetometer sensor probes 548, 847

Maintaining pavement markings 474, 475

Maintaining traffic

Law enforcement officer 476

Performance 486

Temporary signal 476

Traffic maintained 475

Flaggers 472, 475

Maintenance during construction

Failure to 25

Manholes, catchbasins, inlets, monuments

Adjusted to grade 448

Concrete, cast in place 447

Materials 445

Reconstructed to grade 448

Manual control and pushbutton, controller 866

Manufacturers, cellular retaining walls 466

Markers, raised pavement 498

Masonry 429, 445, 447, 645, 650, 664, 665, 678, 719

Masonry cement 426

Material

Department furnished 29

Guaranty 15

Handling 29

Measurement of quantities 52

Median, concrete 463

Mercury vapor luminaire 536

Messenger wire 547, 850

Methods, equipment 46

Micro-surfacing, asphalt concrete

Acceptance 210

Aggregate 204

Equipment 208

Surface preparation 208

Microprocessor, traffic signal controller 861, 876

Mill test reports 394

Mineral filler 168, 647

Minority business enterprise 42

Mixers, PCC 275

Mixing, asphalt concrete 172

Mobilization 291, 505, 506, 507

Monument boxes 448

Monuments 33, 445, 446, 447, 448, 503

Mortar 152, 240, 306, 407, 408, 430, 431, 432, 445, 469, 471, 472, 566, 643, 652, 655, 695, 723, 725, 761

Quick setting 146

Mulching 114, 118, 607, 621, 623, 624, 625, 631, 644, 645

Trees, shrubs 631

MUTCD 473, 576

Navigable water, bridges over 32

NEMA TS-2 847, 859, 860, 862

NEMA, TS-1, TS-2, cabinet and controller 846

Neoprene elastomer bearings 791

Non-reflective sheeting, sign 827

Non-reinforced concrete pipe 430, 431, 432, 729

Notification, flexible pavement 172

Ohio Manual of Uniform Traffic Control Devices 3, 473

Opening project to traffic 39

Optimum moisture, definition of 88

Overpass structure mounted sign supports 524

Paint 78, 147, 175, 374, 375, 380, 398, 547, 549, 582, 634, 658, 675, 728, 762, 772, 773, 774, 833, 844, 846

Aluminum 776

Blue-green vinyl finish coat 783

Inorganic zinc silicate primer 788

Material 773

Aluminum 397, 398, 431, 432, 444, 496, 524, 656, 663, 664, 670, 764, 766, 767, 790, 794, 826, 838, 856

Panels, flashing arrows 486

Parking lot stall markings 579, 581

Partial depth pavement repair

Area to be replaced 136

Placement of asphalt concrete 136

Patching concrete structures 401

Placing, finishing, and curing 402

Preparation of surface 402

Removal of disintegrated concrete 402

Paved gutter 425

Pavement 4, 5, 81, 83, 86, 91, 136, 137, 138, 139, 140, 141, 142, 144, 145, 148, 166, 167, 168, 201, 202, 203, 228, 240, 250, 255, 259, 260, 262, 263, 264, 472, 476, 477, 478, 480, 481, 485, 486, 487, 488, 489, 490, 498, 499, 500, 501, 576, 579, 580, 581, 584, 585, 587, 591, 592, 597, 599, 641, 642, 666, 675, 676, 689, 691, 803, 893, 895, 896, 897, 898, 899

Planing 140

Preparation for marking 577

Recycled 88, 202, 203

Repair 136

Salvaged 202

Subgrade 88, 96

Widening construction 91

Preformed fillers 395, 398

Pavement Markings 472, 476, 478, 485, 486, 576, 581

Application 577, 579, 583, 585, 586, 588, 589, 591, 592, 594, 596, 598, 599

Channelizing lines 580

Curb and island marking 580

Deduction for deficiency 581

Dotted lines 580

Equipment 579, 582, 584, 585, 587, 588, 591, 592, 593, 594, 597, 598

Lane arrows 580

Lane lines 580

Layout and premarking 579

Long lines 580

Maintained 476

Materials 576, 891

Parking lot stall marking 580

Pavement preparation 579

Polyester 893

Preformed 896

Thermoplastic 587, 590, 895

Traffic paint 582, 583, 891

Transverse lines 580

Two way radio communications 581

Glass Beads 477, 478, 582, 585, 676, 898

Lane lines 484

Polyester 585, 641, 675, 688, 893

Thermoplastic 589, 675, 895

Pavement Planning

Equipment 140

Patching 141

Tolerances 141

Pavement repair 145

Area to be repaired 138

Asphalt placement and restoration of shoulders 139

Bonded patching of rigid pavement 147

Full depth rigid pavement removal and flexible replacement 137

Full depth rigid pavement removal and rigid replacement 142

Pavement removal 139

Planning 140

Pavement, flexible

Acceptance 160, 244, 248

Acceptance schedule for sieve 194

Aphalt concrete 185

Approval of laboratory and personnel 168

Asphalt concrete 167, 181, 235, 248

Contractor mix design and quality control 168, 223

Density acceptance 244

Field adjustment 248

Job mix formula, field adjustment 244

Joints 178, 244, 247

Mixing equipment 207

Monitoring 244

Plant mix, general 171

Prime coat 198

Proportioning 206

Reports 234, 244

Required tests 231

Surface tolerances 218

Tack coat 196

Test strip 209

Weather Limitations 196, 207, 212, 219

Pavement, Portland Cement Concrete

Recycled 493

Pavement, Portland Cement Concrete

Construction joints 257

Contraction joints 257

Curing 258

Dowel size 255

Equipment 250

Expansion joints 256

Finishing 257

Form construction 251

Grooving 259

Incidentals 719

Joints 254

Load transfer devices 255

Material 250

Non-shrink grout, non-metalic 721

Opening to traffic 259

Preformed fillers 719

Price adjustments 262

Profile grinding 259

Reinforcement placing 254

Removing forms 259

Silicone joint seals 792

Slip forms 253

Station numbers 258

Thickness 254, 260

Transverse joints 263

Payment

Payroll records 51

Scope of 56

Performed expansion joint filler 397

Phosphor bronze plate, structure 790

Pile 2, 4, 291, 294, 295, 296, 297, 298, 299, 409, 566, 642

Bearing 294

Capacity 296

Cast-in-place 296

Cut-off 298

Defective 298

Driving of 295

Mobilization of equipment 291

Sheet 291

Steel shoes or points 296

Steel, H-piles 297

Temporary bridge 285

Pipe 3, 81, 82, 83, 86, 298, 398, 399, 400, 401, 430, 434, 438, 443, 445, 448, 449, 452, 528, 532, 534, 564, 565, 566, 567, 568, 569, 573, 574, 604, 605, 653, 654, 655, 656, 657, 658, 668, 670, 676, 677, 729, 730, 731, 732, 733, 734, 736, 737, 738, 739, 740, 741, 743, 744, 754, 755, 757, 758, 759, 760, 761, 762, 763, 764, 765, 766, 767, 768, 769, 770, 771, 772, 781, 782, 784, 790, 823, 826, 900, 901, 902, 903

ABS drain, waste, and vent 771

ABS sewer 772

Aluminum alloy 432, 433, 764, 766

Arches 749, 760

Bituminous lined 763

Concrete, drain tile 433

Concrete, perforated 754

Corrugated aluminum box 431, 767

Corrugated steel, bituminous lined 431

Corrugated steel, box 431

Corrugated steel, metallic coated 759

Corrugated steel, mortar lined 431, 761

Corrugated steel, spiral rib 762

Corrugated, aluminum spiral rib 431, 766

Corrugated, polyethylene 768

Drainage of structures 400

Excavation 435

Metric equivalent 430

Polyvinyl chloride, various 770

Precast reinforced concrete box sections, arches, & three sided 744

Precoated, galvanized steel 431, 760

Removal 82

Steel, aluminum, and plastic 757

Structural plate, aluminum 431, 443, 766

Tile, clay drain 449

Tile, concrete drain 449

Tubing, corrugated polyethylene 768

Underdrains 448

Underdrains, aluminum 449

Underdrains, steel 449

Vitrified clay 449

Welded and seamless steel 772

(see also water mains) 564, 565, 567, 568, 570

ABS sewer 431, 432, 433, 772

Aluminum alloy 431, 432

Arches 655, 760

Bituminous coated 431

Bituminous lined 431, 432

Corrugated aluminum box 431

Precoated, galvanized steel 431

Vitrified clay 430, 431, 432, 433

Pipe culverts, sewers and drains

Backfilling 440

Bedding 436

Certification 757

Field paving of new pipe 443

Joining conduit 438

Laying conduit 436

Materials 430

Pipe drains, for rip-rap tree protection 605

Pipe drains, large trees reset 605

Placing concrete pavement 253

Plain concrete pavement 263

Plain Portland Cement Concrete Pavement

Construction 263

Plans 5, 6, 8, 11, 20, 21, 22, 41, 279, 281, 507

Plant materials 629

Plant mix pavements, general

Rollers 173

Planting trees, shrubs, and vines

Bed preparation 630

Holes 629

Inspection 629

Labeling 629

Pruning 631

Transportation, storage and handling 629

Wrapping 631

Plants, bituminous concrete mixing 171

Pneumatically Placed Mortar 407, 408

Materials 403

Reinforcement 404

Poles 523, 541, 668, 669, 673, 817, 825, 848, 849

Steel sign supports 527

Strain 848

Wood 546, 849

Light 3, 225, 226, 227, 228, 328, 518, 520, 668, 690, 817, 819, 830, 834, 835, 843, 844, 866

Strain 540, 546, 551, 552, 553, 673, 848

Tower 520, 822

Polyethylene encasement 565, 902

Polyethylene encasement, water main 570

Polyethylene service branches 901

Polyethylene sheeting, white 274

Polyvinyl chloride (pipe, culverts, sewers, and drains) 449

ABS composite pipe 771

Corrugated smooth interior pipe 433, 770

Profile wall pipe 431, 433, 770

Sanitary pipe 771

Solid wall pipe 449

Portable cement

Air-entraining, blast furnace slag 678

Portable concrete barrier 487, 502

Portland cement 145, 146, 148, 150, 260, 264, 385, 403, 429, 647

Air-entraining, blast furnace slag 694

Concrete base 161

Post construction meeting 52

Posts 452, 453, 455, 456, 496, 661, 662, 665, 669, 781, 782, 784, 785, 796, 803, 823, 824

Fence 784

Guardrail 785

Wood 784

Fence 81, 85, 87, 116, 118, 119, 455, 456, 457, 661, 662, 780, 784, 785

Guardrail 81, 85, 87, 134, 135, 452, 453, 454, 455, 488, 522, 661, 662, 785

U-Channel 669, 823

Wood 2, 540, 541, 546, 552, 553, 607, 622, 668, 673, 816, 849

Power breaker 865

Prebored holes, for piles 298

Precast concrete 501

Modular construction, manholes 447

Precast concrete curb 462

Precast reinforced concrete box sections 431

Precast reinforced concrete outlets 445, 447, 756

Precast traffic dividers removed 83

Preconstruction testing, pneumatically placed mortar 405

Prefabricated edge drain 451, 799

Preformed Bearing Pads 663, 790

Preformed elastomeric compression joint sealer 395

Preformed expansion joint filler 445

Preparation of 12, 145, 146, 196, 198, 336, 380, 382, 401, 402, 403, 405, 625, 626

Preparation of repair are, pneumatically placed mortar 405


Yüklə 7,65 Mb.

Dostları ilə paylaş:
1   ...   100   101   102   103   104   105   106   107   108




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin