steel box culverts 431
steel underdrains 449
Corrugated polyethylene drainage pipe 433
Corrugated polyethylene drainage tubing 449
Corrugated polyethylene smooth lined pipe 431, 432, 449, 768
Corrugated steel box culverts 763
Corrugated steel pipe and pipe arches 431
Bituminous coated 431
Cover aggregate 213
Covering of signs 475
Covering of vehicular signal head 549, 551
Cribs 286, 289, 290
Crushed aggregate walks 459
Culvert 7, 444, 653, 741
Removed 82
Curb 643
Markings 581
Curbing 460
Materials 460
Curing and loading, structural concrete 318
Curing compounds 395
Curing concrete barrier 502
Cut-back asphalt 682
Cutting, in sleeve, valve and valve box 902
Cylinders, concrete 311
Dead trees 634
Deep beam rail 398
Deep pipe underdrains 448, 449, 452
Deflection of falsework 300
Delineators 496
Flexible posts 497
Materials 496
Rectangular reflectors 496
Removal, storage and disposal 497
Rectangular reflectors 496
Depositing structural concrete under water 316
Detector loop signal 545
Dial 888
Differing site conditions 16
Dimensions, verification of, structures 279
Disconnect switch
For traffic signals 549, 850
Disposal of excavated material 288
Disqualification of bidders 14
Ditches, construction of 91
Dotted lines 577
Dowel bars 142, 152, 250, 501
Dowel holes 257, 307, 308
Materials 307
Placement 308
Down guy 541, 552, 849
Drain tile
Clay 754
Concrete 754
Drainage of structures
Excavation 400
Fabrication 399
Materials 399
Removed 85
Scuppers 400
Drainage of subgrade 91
Drains 118, 430, 448, 451, 452, 604, 605, 798
Drift pins, structural steel 349, 357, 408
Drilled shafts
Friction type 413
Drilled shafts, for construction
Friction type drilled shafts 413
Drilled shafts, for structures
Dry construction method 412
Excavation inspection 415
Hole excavation 412
Inspection records 418
Materials 411
Permanent casing construction method 413
Reinforcing steel 416
Slurry 414
Temporary casing construction method 413
Wet construction method 413
Drilling and blasting in rock cuts 121
Driving, of piles 291
Drums 486
Reflectorized sheeting 474
Ductile iron pipe, joints, and fittings 565, 900
Dust control 490
Duties 23, 362
Inspector 23
Dynamic load test for piles
Equipment 410
Test procedures 410
Earthwork 87, 96, 488, 604, 605
Limitations of operations 113
Edge lines 480, 580
Electrical signs 828
Eliminated items 18
Embankment 2, 87, 88, 89, 92, 93, 97, 99, 100, 104, 105, 106, 107, 430, 441, 469, 605, 606, 641, 642, 649, 704, 705
Areas inaccessible to rollers 95
Definition of 88
Granular material 97
Moisture control 95
Random material 94
Suitable material 88
Compaction 87, 88, 95, 96, 100, 103, 104, 157, 158, 159, 167, 176, 235, 238, 243, 427, 429, 442, 459, 690
Emergency, structural concrete placement 316
Emulsions 53, 207, 646, 679, 682
Engineer
Authority of 20
Entrained air structure 274
Environmental protection measures 84, 90
Environmental protection, responsibility for 41
Epoxy coated, reinforcing steel 302
Equipment 7, 36, 46, 62, 63, 64, 65, 66, 70, 123, 140, 145, 146, 148, 150, 153, 163, 165, 167, 173, 196, 198, 204, 207, 208, 211, 212, 217, 218, 250, 264, 274, 291, 326, 332, 359, 364, 383, 386, 409, 410, 469, 471, 507, 515, 516, 517, 535, 536, 540, 541, 549, 554, 564, 570, 576, 577, 582, 585, 587, 593, 598, 643, 730, 835, 859, 861, 864, 870, 881, 882, 887
Erection procedures
Plate girders 344, 353
Erosion control mats 636
Examination of plans, specifications, special provisions and site work 11
Excavation 25, 35, 45, 88, 91, 97, 99, 104, 133, 286, 287, 288, 289, 290, 399, 400, 409, 410, 411, 412, 415, 429, 435, 445, 447, 449, 451, 458, 459, 466, 468, 469, 564, 565, 566, 571, 642
Additional 290
Definition of 88
Disposal 88
Rock 101
Excavation for structures
Classification 286
Cofferdams, cribs, and sheeting 286
Execution of contract 16
Expansion and Contraction Joints, Joint Sealers, and Bearing Devices
Fabrication 394
Materials 395
Expansion joints, structure
Preformed 395
Sliding plates 396
Expansion rockers 396
Expansion shield anchors 142, 456
Explosives 119, 120
Fabric for waterproofing 793
Fabrication, structural steel 352
Fabricator 4, 7, 279, 280, 284, 339, 340, 341, 342, 382, 383, 384, 662, 663
Approval of 279
Failure to execute contract 16
Falsework and forms, structures
Camber 300
Deflection 300
Forms 301
Removal 301
Federal-Aid provisions 32
Fence 455
Chain link 456, 780
Clearing and grading 456
Fabric 457
Hardware 780
Post assemblies 456
Removed 85
Steel posts, gates, frames, braces 781
Woven steel wire 457
Barbed wire 456
Fabric 104, 116, 118, 119, 337, 400, 401, 430, 455, 457, 659, 660, 778, 779, 783, 793
Woven steel wire 456
Fertilizer
Commercial 602
Fertilizing 628, 638
Fiber bounded bituminous coated corrugated steel pipe and pipe arches 760
Field splices, structural steel 357
Fillers, preformed 395
Filter fabric 115, 399, 421, 424, 448, 450
Fine aggregate 146, 264, 276, 403, 690, 694, 695, 696, 697
Fine grading, of subbase/ subgrade, PCC 252
Finishing machine 321, 462
Finishing, patched concrete structure 402
Fire hydrant 903
Fire hydrant adjusted 572
Flagger 475
Flasher controller 555, 557, 884
Flasher, for traffic signal controller 864
Flexible delineator posts 803
Flexible plastic gaskets, for concrete pipe 756
Footings in rock 288
Forms 250, 259, 299, 302, 310, 318, 386, 458, 459, 462, 463, 501
Oiling 302
Proposal 11
Removed 318
Foundation 517, 520, 534, 551, 553, 563, 564, 901
Approval of 288
Traffic signal controller 557
Full depth rigid pavement removal and flexible replacement
placement of asphalt concrete 137
Removal of existing pavement 137
Subgrade 137
Full depth rigid pavement removal and rigid replacement
Correction of subbase or subgrade 143
Opening to traffic 144
Placement of portland cement concrete 143
Removal of existing pavement 142
Subbase 143
Wearing Course Replacement 144
Functional test 550
Galvanized steel 295, 779
Railing 398
Galvanizing 453, 660, 780
Gate valve and valve box 565, 902
General concrete
Materials 704
Geotextile fabrics 113, 114, 797
Glass beads 576, 577, 582, 585, 586, 587, 593, 594, 596, 599, 893, 895, 896, 897, 898, 899, 900
Granular material, definition of 88
Granular material, for embankment 89
Granulated slag 161
Gravel 181, 202, 203, 266, 267, 268, 271, 272, 273, 694, 695, 696, 697, 698, 699, 700, 701, 705, 706, 707, 710, 711, 715, 717
Grease, multipurpose 755
Grid 520
Ground bus bars, signal controllers 884
Ground granulated blast furnace slag, PCC 272
Grounding 507, 513, 515, 520, 868
Grout 145, 147, 307, 308, 320, 652, 695, 721
Non-shrink, non-metallic 721
Guard posts 785
Guardrail 453
Bridge terminal assembly 455
Deep beam rail 453, 784
Erecting rail elements 453
Galvanizing 453
Material 453, 780
Temporary 488
Deep beam rail 453
post 453
Pressure treated 453
Handhole cover, sign supports 523, 825
Handling, measuring and batching PCC 275
Hardware, signs 825
Hauling, Flexible pavements 172
High early strength 266
High early strength concrete 266, 324
Achieving 266
Structures 311
Highway lighting
Cable 547
Duct-cable 519
Ground grid 518
Junction box 518
Holes, for dowels 308
Horizontal deflection, fence 456
Hot applied sealer, crack and joint 719
Hydraulic cement
Air-entraining, portland 678
High early strength portland 678
Masonry 678
Portland 678
Identification 129, 355, 509, 543, 702
Incidentals 507, 508
Inlets 446, 447, 448
Precast 437
Inoculating bacteria 611
Inserting valve box 902
Inspection 3, 23, 39, 41, 75, 91, 103, 260, 351, 355, 356, 360, 363, 366, 379, 380, 382, 383, 386, 403, 407, 411, 415, 418, 447, 448, 523, 531, 535, 538, 567, 628, 629, 641, 667
Final 75
Inspection and testing, pneumatically placed mortar 407
Inspection wells 447
Inspector 2, 7, 23, 24, 39, 53, 59, 75, 76, 362, 363, 368, 370, 371, 373, 374, 376, 381, 586, 597
Authority and duties 23
Installation of
Barrier reflectors 521
Delineators 497
Insulating concrete 318
Intent of contract 16
Internally illuminated signs 538, 830
Island marking 581
Job mix formula, asphalt concrete 223
Job mix formula, development 155
Joint 12, 200, 250, 254, 257, 260, 330, 394, 395, 397, 419, 421, 430, 643, 651, 719, 720, 755
Construction 263
Longitudinal 254, 256
Sealer 250, 395, 419, 421
Joint filler, bituminous pipe 755
Junction boxes 518
Junction chambers 446
Labor, extra work 60
Laboratory dry weight, definition of 88
Lamps 541, 667, 672, 807, 834, 835
Incandescent 672, 834, 844
Mercury 536, 539, 671, 828
Signal 3, 540, 541, 543, 544, 546, 549, 551, 552, 553, 554, 643, 644, 672, 673, 832, 833, 834, 835, 838, 840, 843, 844, 847, 853, 859, 866, 870, 872, 873, 881, 882
Lateral bracing 348
Law enforcement officer 475
Laws to be observed 39
Laying water mains 567
Layout 478, 496, 497, 498, 503, 505, 520, 521, 576, 579, 587, 590, 591, 592, 628, 629
Layout of barrier reflectors 521
Layout of delineators 497
Layout, trees, shrubs, and vines 629
Leaded bronze 358, 790
Legal relations and responsibility to public 31
Legal rights, no waiver of 41
Lifting sod 626
Light pole 518
Lighting 486, 487, 507, 516, 520, 644, 814, 822
Lightning protection device, traffic signal controller 865
Lime Modified Soil
Compacting 106
Contractor Designed Lime Soil 106
Mixing 106
Lime soil stabilized subgrade
Compaction and mixing 109
Materials and spreading 108
Limitation of operations 46
Line marking descriptions, RPM 474
Line placement tolerance, pavement marking 579
Line post, fence 456, 784, 785
Line types, pavement markings 579
Linear grading 134
Liquid membrane-forming compounds 720
Load restrictions 24
Loading concrete 311
Local traffic 472
Location and source, trees, shrubs, and vines 629
Loop detector unit 551, 846, 865
Delay and extension type 847
NEMA TS-2 847
Lot acceptance 193, 194
Low strength mortar backfill 469
Equipment, placing 471
Materials, proportioning 469
Mix adjustment, alternates 470
Lumber 661, 663, 793, 796
Luminaire 507, 508, 516, 517, 520, 532, 534, 535, 538, 539, 540, 667, 668, 671, 804, 817, 819, 828
Magnetometer detector unit 551, 847
Magnetometer sensor probes 548, 847
Maintaining pavement markings 474, 475
Maintaining traffic
Law enforcement officer 476
Performance 486
Temporary signal 476
Traffic maintained 475
Flaggers 472, 475
Maintenance during construction
Failure to 25
Manholes, catchbasins, inlets, monuments
Adjusted to grade 448
Concrete, cast in place 447
Materials 445
Reconstructed to grade 448
Manual control and pushbutton, controller 866
Manufacturers, cellular retaining walls 466
Markers, raised pavement 498
Masonry 429, 445, 447, 645, 650, 664, 665, 678, 719
Masonry cement 426
Material
Department furnished 29
Guaranty 15
Handling 29
Measurement of quantities 52
Median, concrete 463
Mercury vapor luminaire 536
Messenger wire 547, 850
Methods, equipment 46
Micro-surfacing, asphalt concrete
Acceptance 210
Aggregate 204
Equipment 208
Surface preparation 208
Microprocessor, traffic signal controller 861, 876
Mill test reports 394
Mineral filler 168, 647
Minority business enterprise 42
Mixers, PCC 275
Mixing, asphalt concrete 172
Mobilization 291, 505, 506, 507
Monument boxes 448
Monuments 33, 445, 446, 447, 448, 503
Mortar 152, 240, 306, 407, 408, 430, 431, 432, 445, 469, 471, 472, 566, 643, 652, 655, 695, 723, 725, 761
Quick setting 146
Mulching 114, 118, 607, 621, 623, 624, 625, 631, 644, 645
Trees, shrubs 631
MUTCD 473, 576
Navigable water, bridges over 32
NEMA TS-2 847, 859, 860, 862
NEMA, TS-1, TS-2, cabinet and controller 846
Neoprene elastomer bearings 791
Non-reflective sheeting, sign 827
Non-reinforced concrete pipe 430, 431, 432, 729
Notification, flexible pavement 172
Ohio Manual of Uniform Traffic Control Devices 3, 473
Opening project to traffic 39
Optimum moisture, definition of 88
Overpass structure mounted sign supports 524
Paint 78, 147, 175, 374, 375, 380, 398, 547, 549, 582, 634, 658, 675, 728, 762, 772, 773, 774, 833, 844, 846
Aluminum 776
Blue-green vinyl finish coat 783
Inorganic zinc silicate primer 788
Material 773
Aluminum 397, 398, 431, 432, 444, 496, 524, 656, 663, 664, 670, 764, 766, 767, 790, 794, 826, 838, 856
Panels, flashing arrows 486
Parking lot stall markings 579, 581
Partial depth pavement repair
Area to be replaced 136
Placement of asphalt concrete 136
Patching concrete structures 401
Placing, finishing, and curing 402
Preparation of surface 402
Removal of disintegrated concrete 402
Paved gutter 425
Pavement 4, 5, 81, 83, 86, 91, 136, 137, 138, 139, 140, 141, 142, 144, 145, 148, 166, 167, 168, 201, 202, 203, 228, 240, 250, 255, 259, 260, 262, 263, 264, 472, 476, 477, 478, 480, 481, 485, 486, 487, 488, 489, 490, 498, 499, 500, 501, 576, 579, 580, 581, 584, 585, 587, 591, 592, 597, 599, 641, 642, 666, 675, 676, 689, 691, 803, 893, 895, 896, 897, 898, 899
Planing 140
Preparation for marking 577
Recycled 88, 202, 203
Repair 136
Salvaged 202
Subgrade 88, 96
Widening construction 91
Preformed fillers 395, 398
Pavement Markings 472, 476, 478, 485, 486, 576, 581
Application 577, 579, 583, 585, 586, 588, 589, 591, 592, 594, 596, 598, 599
Channelizing lines 580
Curb and island marking 580
Deduction for deficiency 581
Dotted lines 580
Equipment 579, 582, 584, 585, 587, 588, 591, 592, 593, 594, 597, 598
Lane arrows 580
Lane lines 580
Layout and premarking 579
Long lines 580
Maintained 476
Materials 576, 891
Parking lot stall marking 580
Pavement preparation 579
Polyester 893
Preformed 896
Thermoplastic 587, 590, 895
Traffic paint 582, 583, 891
Transverse lines 580
Two way radio communications 581
Glass Beads 477, 478, 582, 585, 676, 898
Lane lines 484
Polyester 585, 641, 675, 688, 893
Thermoplastic 589, 675, 895
Pavement Planning
Equipment 140
Patching 141
Tolerances 141
Pavement repair 145
Area to be repaired 138
Asphalt placement and restoration of shoulders 139
Bonded patching of rigid pavement 147
Full depth rigid pavement removal and flexible replacement 137
Full depth rigid pavement removal and rigid replacement 142
Pavement removal 139
Planning 140
Pavement, flexible
Acceptance 160, 244, 248
Acceptance schedule for sieve 194
Aphalt concrete 185
Approval of laboratory and personnel 168
Asphalt concrete 167, 181, 235, 248
Contractor mix design and quality control 168, 223
Density acceptance 244
Field adjustment 248
Job mix formula, field adjustment 244
Joints 178, 244, 247
Mixing equipment 207
Monitoring 244
Plant mix, general 171
Prime coat 198
Proportioning 206
Reports 234, 244
Required tests 231
Surface tolerances 218
Tack coat 196
Test strip 209
Weather Limitations 196, 207, 212, 219
Pavement, Portland Cement Concrete
Recycled 493
Pavement, Portland Cement Concrete
Construction joints 257
Contraction joints 257
Curing 258
Dowel size 255
Equipment 250
Expansion joints 256
Finishing 257
Form construction 251
Grooving 259
Incidentals 719
Joints 254
Load transfer devices 255
Material 250
Non-shrink grout, non-metalic 721
Opening to traffic 259
Preformed fillers 719
Price adjustments 262
Profile grinding 259
Reinforcement placing 254
Removing forms 259
Silicone joint seals 792
Slip forms 253
Station numbers 258
Thickness 254, 260
Transverse joints 263
Payment
Payroll records 51
Scope of 56
Performed expansion joint filler 397
Phosphor bronze plate, structure 790
Pile 2, 4, 291, 294, 295, 296, 297, 298, 299, 409, 566, 642
Bearing 294
Capacity 296
Cast-in-place 296
Cut-off 298
Defective 298
Driving of 295
Mobilization of equipment 291
Sheet 291
Steel shoes or points 296
Steel, H-piles 297
Temporary bridge 285
Pipe 3, 81, 82, 83, 86, 298, 398, 399, 400, 401, 430, 434, 438, 443, 445, 448, 449, 452, 528, 532, 534, 564, 565, 566, 567, 568, 569, 573, 574, 604, 605, 653, 654, 655, 656, 657, 658, 668, 670, 676, 677, 729, 730, 731, 732, 733, 734, 736, 737, 738, 739, 740, 741, 743, 744, 754, 755, 757, 758, 759, 760, 761, 762, 763, 764, 765, 766, 767, 768, 769, 770, 771, 772, 781, 782, 784, 790, 823, 826, 900, 901, 902, 903
ABS drain, waste, and vent 771
ABS sewer 772
Aluminum alloy 432, 433, 764, 766
Arches 749, 760
Bituminous lined 763
Concrete, drain tile 433
Concrete, perforated 754
Corrugated aluminum box 431, 767
Corrugated steel, bituminous lined 431
Corrugated steel, box 431
Corrugated steel, metallic coated 759
Corrugated steel, mortar lined 431, 761
Corrugated steel, spiral rib 762
Corrugated, aluminum spiral rib 431, 766
Corrugated, polyethylene 768
Drainage of structures 400
Excavation 435
Metric equivalent 430
Polyvinyl chloride, various 770
Precast reinforced concrete box sections, arches, & three sided 744
Precoated, galvanized steel 431, 760
Removal 82
Steel, aluminum, and plastic 757
Structural plate, aluminum 431, 443, 766
Tile, clay drain 449
Tile, concrete drain 449
Tubing, corrugated polyethylene 768
Underdrains 448
Underdrains, aluminum 449
Underdrains, steel 449
Vitrified clay 449
Welded and seamless steel 772
(see also water mains) 564, 565, 567, 568, 570
ABS sewer 431, 432, 433, 772
Aluminum alloy 431, 432
Arches 655, 760
Bituminous coated 431
Bituminous lined 431, 432
Corrugated aluminum box 431
Precoated, galvanized steel 431
Vitrified clay 430, 431, 432, 433
Pipe culverts, sewers and drains
Backfilling 440
Bedding 436
Certification 757
Field paving of new pipe 443
Joining conduit 438
Laying conduit 436
Materials 430
Pipe drains, for rip-rap tree protection 605
Pipe drains, large trees reset 605
Placing concrete pavement 253
Plain concrete pavement 263
Plain Portland Cement Concrete Pavement
Construction 263
Plans 5, 6, 8, 11, 20, 21, 22, 41, 279, 281, 507
Plant materials 629
Plant mix pavements, general
Rollers 173
Planting trees, shrubs, and vines
Bed preparation 630
Holes 629
Inspection 629
Labeling 629
Pruning 631
Transportation, storage and handling 629
Wrapping 631
Plants, bituminous concrete mixing 171
Pneumatically Placed Mortar 407, 408
Materials 403
Reinforcement 404
Poles 523, 541, 668, 669, 673, 817, 825, 848, 849
Steel sign supports 527
Strain 848
Wood 546, 849
Light 3, 225, 226, 227, 228, 328, 518, 520, 668, 690, 817, 819, 830, 834, 835, 843, 844, 866
Strain 540, 546, 551, 552, 553, 673, 848
Tower 520, 822
Polyethylene encasement 565, 902
Polyethylene encasement, water main 570
Polyethylene service branches 901
Polyethylene sheeting, white 274
Polyvinyl chloride (pipe, culverts, sewers, and drains) 449
ABS composite pipe 771
Corrugated smooth interior pipe 433, 770
Profile wall pipe 431, 433, 770
Sanitary pipe 771
Solid wall pipe 449
Portable cement
Air-entraining, blast furnace slag 678
Portable concrete barrier 487, 502
Portland cement 145, 146, 148, 150, 260, 264, 385, 403, 429, 647
Air-entraining, blast furnace slag 694
Concrete base 161
Post construction meeting 52
Posts 452, 453, 455, 456, 496, 661, 662, 665, 669, 781, 782, 784, 785, 796, 803, 823, 824
Fence 784
Guardrail 785
Wood 784
Fence 81, 85, 87, 116, 118, 119, 455, 456, 457, 661, 662, 780, 784, 785
Guardrail 81, 85, 87, 134, 135, 452, 453, 454, 455, 488, 522, 661, 662, 785
U-Channel 669, 823
Wood 2, 540, 541, 546, 552, 553, 607, 622, 668, 673, 816, 849
Power breaker 865
Prebored holes, for piles 298
Precast concrete 501
Modular construction, manholes 447
Precast concrete curb 462
Precast reinforced concrete box sections 431
Precast reinforced concrete outlets 445, 447, 756
Precast traffic dividers removed 83
Preconstruction testing, pneumatically placed mortar 405
Prefabricated edge drain 451, 799
Preformed Bearing Pads 663, 790
Preformed elastomeric compression joint sealer 395
Preformed expansion joint filler 445
Preparation of 12, 145, 146, 196, 198, 336, 380, 382, 401, 402, 403, 405, 625, 626
Preparation of repair are, pneumatically placed mortar 405
Dostları ilə paylaş: |