05
|
-----
|
------
|
Release 5 and earlier
|
----------
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
|
|
05
|
S2-052506
|
[CR]
|
23.207 CR0090: Correction of reference to "End-to-end Quality of Service (QoS) concept and architecture" TS (Rel-5)
|
OKI Electric Industry Co., Ltd.
|
23.207
|
0090
|
-
|
F
|
5.10.0
|
Rel-5
|
SRSES
|
Summary of Change: Correction of reference to "End-to-end Quality of Service (QoS) concept and architecture" TS
|
Noted
|
05
|
S2-052608
|
[CR]
|
23.060 CR0540: Handling of double Iu signalling connection in the SGSN (Rel-5)
|
Nokia
|
23.060
|
0540
|
-
|
F
|
5.11.0
|
Rel-5
|
TEI5
|
This CR clarifies the case where UE and SGSN PMM states are not synchronised and the SGSN receive a new Iu signalling connection request while it already has one Iu connection.
|
Revised in S2-052809
|
05
|
S2-052609
|
CR
|
23.060 CR0541: Handling of double Iu signalling connection in the SGSN (Rel-6)
|
Nokia
|
23.060
|
0541
|
-
|
A
|
6.10.0
|
Rel-6
|
TEI5
|
This CR clarifies the case where UE and SGSN PMM states are not synchronised and the SGSN receive a new Iu signalling connection request while it already has one Iu connection.
|
FOR E-MAIL APPROVAL
|
05
|
S2-052764
|
CR
|
23.060 CR0542: RAB preservation and service requests (Rel-5)
|
Lucent Technologies
|
23.060
|
0542
|
-
|
F
|
5.11.0
|
Rel-5
|
TEI5
|
Summary of change: The restriction that the UE is not allowed to send the Service Request of type "data" is deleted.
|
Approved
|
05
|
S2-052765
|
CR
|
23.060 CR0535R1: RAB preservation and service requests (Rel-6)
|
Lucent Technologies
|
23.060
|
0535
|
1
|
A
|
6.10.0
|
Rel-6
|
TEI5
|
RAB preservation and service requests
|
Approved
|
05
|
S2-052809
|
CR
|
23.060 CR0540: Handling of double Iu signalling connection in the SGSN (Rel-5)
|
Nokia
|
23.060
|
0540
|
1
|
F
|
5.11.0
|
Rel-5
|
TEI5
|
This CR clarifies the case where UE and SGSN PMM states are not synchronised and the SGSN receive a new Iu signalling connection request while it already has one Iu connection.
|
FOR E-MAIL APPROVAL
|
06
|
-----
|
------
|
Release 6
|
----------
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
|
|
06
|
S2-052507
|
[CR]
|
23.207 CR0091: Correction of reference to "End-to-end Quality of Service (QoS) concept and architecture" TS (Rel-6)
|
OKI Electric Industry Co.,Ltd.
|
23.207
|
0091
|
-
|
A
|
6.6.0
|
Rel-6
|
SRSES
|
Summary of Change: Correction of reference to "End-to-end Quality of Service (QoS) concept and architecture" TS
|
Noted
|
06
|
S2-052526
|
WITHDRAWN
|
23.060 CR0536: Clarification of the use of Service Request procedure (Rel-6)
|
Nortel
|
23.060
|
0536
|
-
|
F
|
6.10.0
|
Rel-6
|
TEI6
|
Suggest clarification in 23.060 that the UE is allowed to send a second Service Request while connected in the scenario where some non-real RABs have been released by the network while still active in the UE.
|
WITHDRAWN
|
06
|
S2-052539
|
DISCUSSION
|
GAN charging in PS domain
|
Alcatel
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
This contribution discusses on the comparative advantages and drawbacks on various solutions to enable specific GAN charging in PS domain and proposes a solution.
|
Noted
|
06
|
S2-052540
|
[CR]
|
23.060 CR0537: GAN charging in PS domain (Rel-6)
|
Alcatel
|
23.060
|
0537
|
-
|
F
|
6.10.0
|
Rel-6
|
TEI6
|
This CR to 23.060 proposes a solution to enable specific GAN charging in PS domain.
|
Noted
|
06
|
S2-052575
|
CR
|
23.060 CR0538: SGSN indication of RAN setup complete at Secondary PDP context activation (Rel-6)
|
Ericsson
|
23.060
|
0538
|
-
|
F
|
6.10.0
|
Rel-6
|
PoC
|
Proposes making the Update PDP Context procedure mandatory after RAN setup is complete.
|
Noted: LS to CT WG4 in S2-052976
|
06
|
S2-052597
|
[CR]
|
23.236 CR0029: Introducing load re-distribution for Gs interface (Rel-6)
|
Ericsson
|
23.236
|
0029
|
-
|
F
|
6.1.0
|
Rel-6
|
TEI6, Iu-Flex
|
Support for NOM1 is added to TS 23.236. The chosen approach does not require any changes in the Gs interface and the O&M operations only affect SGSN.
|
Revised in S2-052977
|
06
|
S2-052645
|
[CR]
|
23.141 CR0079: Correction of some references to release 6 replacements (Rel-6)
|
Lucent Technologies
|
23.141
|
0079
|
-
|
F
|
6.8.0
|
Rel-6
|
PRESNC
|
Correction of some references to release 6 replacements
|
Revised in S2-052979
|
06
|
S2-052646
|
CR
|
23.141 CR0080: Correction of some references to release 6 replacements (Rel-7)
|
Lucent Technologies
|
23.141
|
0080
|
-
|
A
|
7.0.0
|
Rel-7
|
PRESNC
|
Correction of some references to release 6 replacements
|
FOR E-MAIL APPROVAL
|
06
|
S2-052667
|
DISCUSSION
|
How to indicate to the GGSN that a mobile is using a GAN/GSM/UMTS/HSDPA cell?
|
Vodafone
|
-
|
-
|
-
|
-
|
-
|
Rel-6
|
-
|
This contribution provides an update of S2-052172 taking into account the response from SA WG1 and proposes a way forward.
|
Noted
|
06
|
S2-052690
|
[CR]
|
23.002 CR0165: MSC Play announcement for VT (Rel-6)
|
China Mobile
|
23.002
|
0167
|
-
|
F
|
6.9.0
|
Rel-6
|
TEI6
|
Add the function of MSC (including MSC Server and MGW) to play multimedia or voice announcement to caller.
|
Noted
|
06
|
S2-052734
|
DISCUSSION
|
VIG merged into MSC Server/MGW
|
China Mobile, Huawei
|
-
|
-
|
-
|
-
|
-
|
-
|
TEI6
|
This contribution proposes to introduce the advantages of merging the VIG (Video Interworking Gateway) function into gateway MSC Server/MGW.
|
Noted
|
06
|
S2-052735
|
CR
|
23.002 CR0165: The position of IWF (Rel-6)
|
China Mobile, Huawei
|
23.002
|
0165
|
-
|
F
|
6.9.0
|
Rel-6
|
TEI6
|
Summary of change: Clarifing the IWF is a separate entity or a functionality module in MSC.
|
Noted
|
06
|
S2-052736
|
WITHDRAWN
|
CS domain Video service platform
|
China Mobile, Huawei
|
-
|
-
|
-
|
-
|
-
|
-
|
TEI6
|
WITHDRAWN
|
WITHDRAWN
|
06
|
S2-052963
|
CR
|
23.002 CR0166 MSC limit VT service in particular area (Rel-6)
|
China Mobile
|
23.002
|
0166
|
-
|
-
|
-
|
-
|
TEI-6
|
Summary of change: Add the function of MSC to restrict VT according to location informaiton of UE.
|
Noted
|
06
|
S2-052976
|
LS OUT
|
[DRAFT] LS on indication to GGSN of secondary PDP context complete
|
SA WG2 (Ericsson)
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
|
FOR E-MAIL APPROVAL
|
06
|
S2-052977
|
CR
|
23.236 CR0029R1: Introducing load re-distribution for Gs interface (Rel-6)
|
Ericsson
|
23.236
|
0029
|
1
|
F
|
6.1.0
|
Rel-6
|
TEI6, Iu-Flex
|
Support for NOM1 is added to TS 23.236. The chosen approach does not require any changes in the Gs interface and the O&M operations only affect SGSN.
|
FOR E-MAIL APPROVAL
|
06
|
S2-052978
|
LS OUT
|
[DRAFT] LS on Conditionally approved CT WG1 CR on 29.018
|
SA WG2 (Ericsson)
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
|
FOR E-MAIL APPROVAL
|
06
|
S2-052979
|
CR
|
23.141 CR0079: Correction of some references to release 6 replacements (Rel-6)
|
Lucent Technologies
|
23.141
|
0079
|
1
|
F
|
6.8.0
|
Rel-6
|
PRESNC
|
Correction of some references to release 6 replacements
|
Approved
|
|