3gpp tsg-sa wg2 meeting Document List



Yüklə 2,99 Mb.
səhifə2/19
tarix05.01.2022
ölçüsü2,99 Mb.
#76286
1   2   3   4   5   6   7   8   9   ...   19
05

-----

------

Release 5 and earlier

----------

-

-

-

-

-

-

-







05

S2-052506

[CR]

23.207 CR0090: Correction of reference to "End-to-end Quality of Service (QoS) concept and architecture" TS (Rel-5)

OKI Electric Industry Co., Ltd.

23.207

0090

-

F

5.10.0

Rel-5

SRSES

Summary of Change: Correction of reference to "End-to-end Quality of Service (QoS) concept and architecture" TS

Noted

05

S2-052608

[CR]

23.060 CR0540: Handling of double Iu signalling connection in the SGSN (Rel-5)

Nokia

23.060

0540

-

F

5.11.0

Rel-5

TEI5

This CR clarifies the case where UE and SGSN PMM states are not synchronised and the SGSN receive a new Iu signalling connection request while it already has one Iu connection.

Revised in S2-052809

05

S2-052609

CR

23.060 CR0541: Handling of double Iu signalling connection in the SGSN (Rel-6)

Nokia

23.060

0541

-

A

6.10.0

Rel-6

TEI5

This CR clarifies the case where UE and SGSN PMM states are not synchronised and the SGSN receive a new Iu signalling connection request while it already has one Iu connection.

FOR E-MAIL APPROVAL

05

S2-052764

CR

23.060 CR0542: RAB preservation and service requests (Rel-5)

Lucent Technologies

23.060

0542

-

F

5.11.0

Rel-5

TEI5

Summary of change: The restriction that the UE is not allowed to send the Service Request of type "data" is deleted.

Approved

05

S2-052765

CR

23.060 CR0535R1: RAB preservation and service requests (Rel-6)

Lucent Technologies

23.060

0535

1

A

6.10.0

Rel-6

TEI5

RAB preservation and service requests

Approved

05

S2-052809

CR

23.060 CR0540: Handling of double Iu signalling connection in the SGSN (Rel-5)

Nokia

23.060

0540

1

F

5.11.0

Rel-5

TEI5

This CR clarifies the case where UE and SGSN PMM states are not synchronised and the SGSN receive a new Iu signalling connection request while it already has one Iu connection.

FOR E-MAIL APPROVAL

06

-----

------

Release 6

----------

-

-

-

-

-

-

-







06

S2-052507

[CR]

23.207 CR0091: Correction of reference to "End-to-end Quality of Service (QoS) concept and architecture" TS (Rel-6)

OKI Electric Industry Co.,Ltd.

23.207

0091

-

A

6.6.0

Rel-6

SRSES

Summary of Change: Correction of reference to "End-to-end Quality of Service (QoS) concept and architecture" TS

Noted

06

S2-052526

WITHDRAWN

23.060 CR0536: Clarification of the use of Service Request procedure (Rel-6)

Nortel

23.060

0536

-

F

6.10.0

Rel-6

TEI6

Suggest clarification in 23.060 that the UE is allowed to send a second Service Request while connected in the scenario where some non-real RABs have been released by the network while still active in the UE.

WITHDRAWN

06

S2-052539

DISCUSSION

GAN charging in PS domain

Alcatel

-

-

-

-

-

-

-

This contribution discusses on the comparative advantages and drawbacks on various solutions to enable specific GAN charging in PS domain and proposes a solution.

Noted

06

S2-052540

[CR]

23.060 CR0537: GAN charging in PS domain (Rel-6)

Alcatel

23.060

0537

-

F

6.10.0

Rel-6

TEI6

This CR to 23.060 proposes a solution to enable specific GAN charging in PS domain.

Noted

06

S2-052575

CR

23.060 CR0538: SGSN indication of RAN setup complete at Secondary PDP context activation (Rel-6)

Ericsson

23.060

0538

-

F

6.10.0

Rel-6

PoC

Proposes making the Update PDP Context procedure mandatory after RAN setup is complete.

Noted: LS to CT WG4 in S2-052976

06

S2-052597

[CR]

23.236 CR0029: Introducing load re-distribution for Gs interface (Rel-6)

Ericsson

23.236

0029

-

F

6.1.0

Rel-6

TEI6, Iu-Flex

Support for NOM1 is added to TS 23.236. The chosen approach does not require any changes in the Gs interface and the O&M operations only affect SGSN.

Revised in S2-052977

06

S2-052645

[CR]

23.141 CR0079: Correction of some references to release 6 replacements (Rel-6)

Lucent Technologies

23.141

0079

-

F

6.8.0

Rel-6

PRESNC

Correction of some references to release 6 replacements

Revised in S2-052979

06

S2-052646

CR

23.141 CR0080: Correction of some references to release 6 replacements (Rel-7)

Lucent Technologies

23.141

0080

-

A

7.0.0

Rel-7

PRESNC

Correction of some references to release 6 replacements

FOR E-MAIL APPROVAL

06

S2-052667

DISCUSSION

How to indicate to the GGSN that a mobile is using a GAN/GSM/UMTS/HSDPA cell?

Vodafone

-

-

-

-

-

Rel-6

-

This contribution provides an update of S2-052172 taking into account the response from SA WG1 and proposes a way forward.

Noted

06

S2-052690

[CR]

23.002 CR0165: MSC Play announcement for VT (Rel-6)

China Mobile

23.002

0167

-

F

6.9.0

Rel-6

TEI6

Add the function of MSC (including MSC Server and MGW) to play multimedia or voice announcement to caller.

Noted

06

S2-052734

DISCUSSION

VIG merged into MSC Server/MGW

China Mobile, Huawei

-

-

-

-

-

-

TEI6

This contribution proposes to introduce the advantages of merging the VIG (Video Interworking Gateway) function into gateway MSC Server/MGW.

Noted

06

S2-052735

CR

23.002 CR0165: The position of IWF (Rel-6)

China Mobile, Huawei

23.002

0165

-

F

6.9.0

Rel-6

TEI6

Summary of change: Clarifing the IWF is a separate entity or a functionality module in MSC.

Noted

06

S2-052736

WITHDRAWN

CS domain Video service platform

China Mobile, Huawei

-

-

-

-

-

-

TEI6

WITHDRAWN

WITHDRAWN

06

S2-052963

CR

23.002 CR0166 MSC limit VT service in particular area (Rel-6)

China Mobile

23.002

0166

-

-

-

-

TEI-6

Summary of change: Add the function of MSC to restrict VT according to location informaiton of UE.

Noted

06

S2-052976

LS OUT

[DRAFT] LS on indication to GGSN of secondary PDP context complete

SA WG2 (Ericsson)

-

-

-

-

-

-

-




FOR E-MAIL APPROVAL

06

S2-052977

CR

23.236 CR0029R1: Introducing load re-distribution for Gs interface (Rel-6)

Ericsson

23.236

0029

1

F

6.1.0

Rel-6

TEI6, Iu-Flex

Support for NOM1 is added to TS 23.236. The chosen approach does not require any changes in the Gs interface and the O&M operations only affect SGSN.

FOR E-MAIL APPROVAL

06

S2-052978

LS OUT

[DRAFT] LS on Conditionally approved CT WG1 CR on 29.018

SA WG2 (Ericsson)

-

-

-

-

-

-

-




FOR E-MAIL APPROVAL

06

S2-052979

CR

23.141 CR0079: Correction of some references to release 6 replacements (Rel-6)

Lucent Technologies

23.141

0079

1

F

6.8.0

Rel-6

PRESNC

Correction of some references to release 6 replacements

Approved


Yüklə 2,99 Mb.

Dostları ilə paylaş:
1   2   3   4   5   6   7   8   9   ...   19




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin