New installations that have received GHG emissions permit and have started operation after 01.01.2009 but before 30.09.2009, fulfil the definition for New entrant (see section 5.1). Those installations receive allowances in this Allocation plan based on the methodology for allocation of allowances from the New entrants reserve. The method of assigning allowances for this group of new entrants is presented in section 5.2.2. A list with this installations and the allowances allocated to them following the rules for New entrants are presented in table P.3.1 and P.3.2, Appendix 3