16376 Flood Test
Flood test shall be performed in the presence of the Engineer. Perform the flooding by use of water truck.
If a depression is found where water ponds to a depth of more than 3mm, fill or otherwise correct to provide proper drainage.
Feather and smooth the degree of fill so that the joint between fill and original surface is invisible.
164 LANDSCAPING
1641 General
Land preparation and planting shall be executed at all times under the guidance of an experienced workman, who is thoroughly familiar with land preparation for gardening, plants and their method of planting and the maintenance at work completion.
Grass & plant
Planting shall generally be executed by sub-contractors experienced in landscaping.
Plant material shall be delivered to meet or exceed the plant specification given in drawings and schedules. Grass shall be free from noxious weeds.