01305 Qualification of Workmen
Adequate number of workmen who are skilled/trained and experienced in the necessary crafts and who are thoroughly familiar with the specified requirements and methods needed for the proper performance of the work in each section of this Technical Specification shall be provided by the Contractor.
In addition to this general requirement, the specific requirements as stated under each section of this Specification shall be met.
01306 Cost Included
Cost of materials [as indicated on drawings or specified in the Technical Specification, Bill of Quantities, Schedules, etc.], labour, equipment, tools, temporary works, supervisory personnel and related items required for the satisfactory execution of an item shall be borne by the contractor whether or not specified.