səhifə 52/105 tarix 03.11.2017 ölçüsü 7,43 Mb. #29078
The JCT-VC did not send or receive formal liaison communications at this meeting.
Opening remarks
Opening remarks included:
Remarks on lateness of documents.
Remarks on the number of documents.
Primary topic areas were noted as follows:
HLS
SHVC
RExt
Corrigenda items and preparation of new edition (how to progress RExt to final approval ballot in ISO/IEC)
Screen content coding CfP results
Other
Verification testing had been completed
Unfinished (or less-than-optimally finished) deliverables
HEVC conformance (& Draft DoCR)
RExt draft finalization
HM test model text
Two main tracks were followed for most meeting discussions:
Scheduling: Generally meeting time was scheduled during 0800 – 2000, with coffee and lunch breaks as convenient. The meeting had been announced to start with AHG reports and continue with parallel review on SHVC HLS, SHVC and RExt CE work and related contributions during the first few days. Ongoing refinements were announced on the group email reflector as needed.
Some particular scheduling notes are shown below, although not necessarily 100% accurate:
Thu. 27 Mar., 1st day 0900–2000
JCT-VC opening and review of AHG reports [JRO & GJS] 0900–1315 (MP1)
SCC CfP response presentations of technical proposals [JRO] 1445–2000 (MP1)
HLS BoG [J. Boyce] 1445–2000 (Aud. 3B)
Fri. 28 Mar., 2nd day 0800–1900
RExt [JRO] 0800–1300, 1630–1900 (MP1)
HLS BoG [J. Boyce] 0900–1300, 1430–1900 (3B), esp.:
SCC CfP Summarization BoG [H. Yu. R. Cohen, R. Joshi] 0800–1300 (3A)
SCC CfP results review [JRO] 1430–1600 (MP1)
SCE1 and related non-CE SHVC contributions [GJS] 1430–1900 (3A)
Sat. 29 Mar., 3rd day 0800–2000
Parallel activity: JCT-3V first day 0900–2000 (3A+B)
Non-CfP SCC or RExt [R. Cohen] 0830–1330, 1500–1730 (MP1)
HLS [Y.-K. Wang] 0900–1330, 1500–1630 (S2)
SHVC position calculation [J. Boyce] 0800–1330 (S1)
JCT-VC review of Non-CfP SCC / RExt and SHVC position calculation [GJS] 1600–2000 (MP1)
Sun. 30 Mar., 4th day 0900–2000 [Summer time change noted]
JCT-VC review of SHVC position calculation and HLS [GJS] 0900–1200 (Aud. 2)
JCT-VC remainders [GJS] 1200–1400, 1330–1800
RExt BoG [D. Flynn & C. Rosewarne] 1830–2000
HLS BoG [J. Boyce] 1830–2000
Mon. 31 Mar., 5th day 1430–2100
Parent level: WG 11 plenary 0900–1400
Parent level: VCEG plenary 1400–1600
Parent level: Joint meeting 1600–1800 (SCC &c)
JCT-VC HLS 1815–2100 (GJS) (3B)
JCT-VC RExt 1815–2100 (JRO) (Aud. 2)
Tue. 1 Apr., 6th day 0800–2100
JCT-VC RExt and next steps for SCC (GJS & JRO) 0800–1000+ (Aud. 2)
SHVC position calculation [J. Boyce] 0800–1000 (Room A)
HLS [J. Boyce] 0900–1100 (Room A)
SCM [R. Cohen] (Aud. 2)
RExt editorial review [GJS] 1000 (Foyer Aud. 2B)
RExt colour VUI [GJS] 1200 (Foyer Aud. 2B)
Parent level: Joint meeting 1600–1800 (various topics)
RExt editorial review [DF] 1800–2100 (3A)
Wed. 2 Apr., 7th day 1130–2100
Parent level: WG 11 plenary 0900–1100
JCT-VC review of side activity , RExt profiling details 1130−1300 (Aud. 2)
Parent level: VCEG plenary 1300–1400 (Aud. 2)
SCC 1500−1700 BoG (Room 3A)
HLS 1500−1800 (Aud. 2)
JCT-VC remainders 1800-2100 (Aud. 2)
SHVC CGS phase 2.1 vs. 2.2
HEVC v1 Conformance Q0219
SHVC conformance (To be part of conformance AHG – volunteers: J. Boyce, Y. Ye, T. Suzuki, A. Ramasubramonian) & ref soft
Verification test follow-up (Q0019, Q0204 to be the basis of output doc)
RExt conformance Q0249
RExt coding features Q0051
RExt finalization and editorial review BoG 1900−2100
Parent level: ISO/IEC editor guidance 1700–1800 (Room 5)
Thu. 3 Apr., 8th day 0800–2100
Parent level: Joint meeting 1500–1700 (various topics)
BoG position & phase adj SHVC Room A 8am
BoG HLS Room A 1000
BoG SCC Room 3A 8am-1000
JCT-VC & JCT-3V joint HLS review 1700-1800 Aud. 2
JCT-VC Remainders 0800-1500 Aud. 2
0800 Misc
1000 Still picture
1030 SCC Review
AHG plans
RExt DoCR (IT NB: FPA)
Rectangular region FPA
1700 HLS BoG and revisits review Q0223
Shared DPB further discussion
1900 SHVC position & phase adjustment BoG review
CE planning (SCC, CGS WP?, 12 b SHVC?)
Output doc planning
Notes on some discussions completed
RExt, CABAC initialization and CBF
Version 1 defects MinCR (confirmed Wed p.m. (GJS)), Q0111
SCC Project desc.
Profiles – see joint meeting notes in section 8.1.
CPB size effect for all-intra profiles
Bit rates for high-throughput profile
12 bit profile Q0206
Fri. 4 Apr., 9th day 0800–1230
Parent level: WG 11 plenary 1400–2200
JCT-VC closing plenary 0800–1230
AHG plans
Output docs
WG11 DoCRs, NBs, resolutions
CE plans
Q0256 check
Dostları ilə paylaş: