Staff quarter and children park
a) Snakes frequently seen throughout the year due to open space covered with grasses and bushes.
b) Tiling of surface and carpeting of road required.
c) Window frame rusted and jammed requires replacement.
d) Parapet of all quarters including principal’s quarter is highly damaged and falling.
e)Tiling of paths.
B) Deposit work given to MES(Rs. 8.5 Lakh)
a)Staff colony - internal wiring, exhaust fans, slab in kitchen.
b)Toilet and ramp for physically disabled children on ground floor
(Work started on 14.08.15)
a)Sale of old examination answer sheets, practical files, newspaper, magazine
b). Condemnation of unserviceable articles worth 1.8 Lakh approx.
|
The Principal appreciated and thanked the Chairman for the side path tiling of the Main Gate of the Vidyalaya.
Chairman assured his support and co-operation on behalf of VMC.
The chairman emphasized that fixing of Fans must be checked yearly.
The Nominee Chairman suggested the annual maintenance of electrical appliances like fans, lights etc.
VMC members suggested to go for Syntax doors instead of the wooden and iron doors for the safety of students. Parent member also added her support to this suggestion.
Principal proposed a separate Water Point for girls in Primary.
All the members seconded that water point must be sufficient for Girls and Boys.
The Chairman appreciated the requirement of funds for improving the living conditions in the Staff Quarters of Vidyalaya.
The Principal informed that 8.5 lakh has already been sanctioned by KVS HQ for internal wiring.
The Principal requested for an engineer member from ordnance factory to supervise the work being done by MES in staff Quarters.
Chairman assured his support and co-operation on behalf of VMC for contractor.
|