PROFESSIONAL SKILLS:
• Military & Defence, Rail, Oil & Gas; Civil projects.
• Project Management Consultant background PMC, Quality Control and Quality Assurance QA/QC Strong Experience.
• Civil Engineering, reinforced concrete & metallic carpentry structures calculations and drawings,
• IRCA LEAD Auditor; ISO 9001&14001 Quality Management System & Environmental Management System.
• PQP Project Quality Plan elaboration, implementation and follow up; ITP Inspection test plan elaboration and implementation, procedures elaboration, implementation and follow up;
• Expert on Concrete Mix Design, fresh and hardened testing, soil and geotechnical testing.
• Concrete piling testing, concrete pre stressing, wall anchors, DFT test coating, galvanization, welding quality control, metallic carpentry.
• Clear and effective Communication skills, English, French and Arabic.
• Multi cultural team leading, negotiating, decision-making & problem solving skills.
EDUCATION:
• 2001-2002 INSA university, Lyon France, Master of Science in Civil & Construction materials (INSA Lyon is ranked among the top universities of Science and Technology in Europe) http://www.insa-lyon.fr/indexEN.php
• 1996-2000 École Polytechnique ENP, Algiers Algeria. Civil Engineer http://www.enp.edu.dz (a state supported institution of higher education and research, The École trains the scientific, industrial and economic elite of the Algerian nation).
• 1994-1996 Construction Materials National Institute INMC, Material Engineer, Algeria.
WORK EXPERIENCE SUMMARY:
Since April 2015, Company: Archen Engineering Consultants & Project Management, Saudi Arabia - Riyadh
Position: Senior QA/QC Specialist.
April 2014 - July 2014, Company: Lafarge Holcim ready-mix Algeria, Position Concrete Quality Director.
July 2010- December 2013, Company: Pizzarotti (Alstom- Pizzarotti JV), Abu Dhabi, UAE –Algeria. Position: Project QA/QC Manager
August 2009 – June 2010, Company: QDVC Qatar Diar - VINCI Grand Projets Qatar, Qatar.
Position: Senior QA/QC Engineer
November 2008 - July 2009; Company: SNC LAVALIN international Qatar
Position: Project Senior Quality Control Engineer
January - September 2008; Company: Qatar Industry Laboratories QIL- Doha Qatar
Position: Material Lab Coordinator.
July 2003-December 2007; Company: Algerian Cement Company, ORASCOM OCI actual Lafarge-Holcim, position: Team Leader - Quality Control & Technical Customer Service.
October 2002 - June 2003 Company: PRAIRIAL Housing Construction, Lyons France, Position: Junior Civil Engineer.
Duties:
-
Project Cycle Management (PCM).
-
Direct supervision on special projects of the Ministry of Interior.
-
Control Projects Request for Proposal (RFP), drawings, Bills of Quantities (BOQs), specifications, and contracts accordance to project requirements and standards.
-
Control the Minimum Technical Requirements (MTR) of new projects.
-
Procedures elaboration, implementation and follow up.
-
Actively promote the audits, elaborate the annual audit plan, organize and lead audits.
30 concrete batch plants with site laboratories; 25 aggregates quarries with site labs, 3 cement plants
Duties:
• Manage the CDL 4th Lafarge technical and development laboratory in the world for concrete and cement new solutions, manage the lab coordinator and 3 engineers, 4 technicians.
• Lead and mentor 5 Regional Quality Managers, 22 Quality Engineers and Technicians.
• Supplying all types of high quality concrete to the prestigious country projects.
• Perform concrete trials mixes and laboratory experiments using different concrete additives and materials, with the aim to enhance the performance of the concrete and achieve more cost effective mix designs and higher profit margins for the company.
• Project Quality Plan (PQP) elaboration, implementation and follow up.
• Inspection test plan (ITP) elaboration according to the project specifications and standards.
• Procedures elaboration, implementation and follow up.
• Ensure to provide technical support to sales managers and marketing staff on daily basis.
• Participate in important meetings with the local authorities.
•Participate to the Algerian standards technical committee meetings on monthly basis, to elaborate new standards, inform the marketing and sales if evolution or changes exist.
• Coordination with clients and their consultants on weekly basis for the quality process improvements.
• Actively promote the audits, elaborate the annual audit plan, organize and lead audits.
• Manage the day-to-day operations of Quality, main Control Laboratories, and concrete batch plants.
• Maintain the calibration status of concrete batch plants and laboratories instruments.
• Manage inventory of lab supplies and equipment.
• Ensure the good progress of staff training, such as QC & Lab Engineers and Technicians.
Rail Project: Tramway of Constantine Algeria 450 million Euro. - 10 km tramway rail way,
Piling, concrete slabs, - viaduct voussoir bridge 650 m long and 40 meters high. - Stadium 7000 spectators, with full metallic carpentry roof. - 07 walls with ground anchors of 60 meters longs and 12 meters high.
Lead and tutor 12 QC Engineers, 3 QA Engineers, the Lab Manager and 6 Technicians and 2 Geologists. Reporting to Project Manager and Corporate Pizzarotti Quality Manager in Italy.
Duties:
• Project Quality Plan PQP elaboration, implementation and follow up.
• Inspection Test Plan (ITP) elaboration according to the project specifications and standards procedures elaboration, implementation and follow up.
• Assist the engineering office & project process to achieve the operations on time according to the planning and project specifications.
• Ensure that project contract requirements are in line with company quality requirements, objectives and systems.
• Ensuring the good use of the last version of procedures and drawings on site.
• Develop and deploy on site all necessary and supplementary documentations related to QA/QC to achieve correct activities according to project specifications.
• Evaluate and identify the non-compliances, open NCRs and propose solutions and follow the progress of actions to close NCRs, provide recommendations.
• Actively promote the internal and external audits, elaborate the annual audit plan, organize and lead audits (prepare checklists and all necessary documents for the audits) site visits with subcontractors, suppliers in order to evaluate of the improvement progress.
• Make sure that all records were done according to company policy; ensure that the traceability is respected.
• Examination of incoming quality reports, materials testing reports and inform key persons about the deficiencies if exist, and propose solutions/quick actions and follow-up their execution.
• Ensure and promote the good communication of quality policy and all documents related to QA/QC for all project key persons.
• Evaluate and report to the top management the status of quality performance indexes.
• Coordination with 3rd party laboratory regarding all lab activities on site.
• Coordination with the client consultant on weekly bases for the quality process Improvement.
•Review work procedures, ITP’s, materials approval reports and all necessary QA/QC documents contractors and subcontractors requested by consultants.
• Ensure that subcontractors are using good drawings and procedures on site.
• Ensuring the follow up of standards evolutions or changes.
• Ensure that the sampling is done correctly by laboratories as per ITP, and correct materials are used on site and good work practices are being adhered to the relevant project specifications and standards.
• supervising and follow up site lab activities, equipment calibration follow up.
• Examination of invoices (laboratory tests and hired technicians timesheet).
• Promote team working and professional behaviour within quality department.
• Ensure the compliance of all quality department staff to HSE specifications, procedures and policy.
Duties:
• Verify the implementation efficiency of the Project Quality Plan, and report deficiencies, if exist, to the QA/QC manager, provide recommendations and follow-up their execution.
• Assist the engineering office & project process to achieve the operations on time according to the planning and Vinci requirements and project specifications.
• Verify that project contract requirements are in line with company quality requirements, objectives and systems.
• Ensure the availability of necessary QA/QC documents with latest version on site, such as the procedures and technical documents.
• Ensure that project contract requirements are in line with company quality requirements, objectives and systems.
• Prepare QA/QC reports, identify deficiencies, if exist, and provide recommendations.
• Coordination with the client consultant on daily basis, and participate to the weekly coordination meetings to evaluate the improvement of quality process.
• Evaluate and identify the non-compliances to the company and project specifications, open NCRs and propose solutions and follow the progress of actions to close NCRs.
• Promote internal and external audits, verify and apply annual audit plan, organize and lead audits (prepare checklists, if necessary, and all necessary document for the audits) and site visits, subcontractors and suppliers in order to evaluate the improvement progress.
• Make sure that all records were stored according to company policy; ensure that the traceability is respected.
• Ensure the coordination and respect of the inspection test plan on site by the 3rd party laboratories Exova/ Aces.
• Examination of incoming QA/QC reports & materials testing reports; make recommendations and follow-up their actions.
• Examination of invoices (laboratory testing and hired technicians working timesheet).
• Supervising and follow up of the site lab activities, Equipment calibration follow-up.
• Examination of the request for inspection (RFIs) before sending to the consultant.
• Achievement of quality activities and material daily inspections.
• Follow-up of the RFIs status progress.
• Coordination and follow up with other departments for the corrective actions needed in case of comments or rejection of the RFIs.
• Material approval request (MAR) and Equipment inspection plan (EIP).
• Examination of the EIP and MAR documents before submitting them to the consultant.
• Follow-up and record EIP and MAR status progress.
• Ensuring the good and correct application of the EIPs on site.
• Supervising QA/QC Engineers and Material Inspectors, provide them with all necessary support.
• Promote team working and professional behaviour.
• Ensure the compliance of quality team to HSE specifications, procedures and policy.
Qatalum alumina project 2000 Mil € ; Structures achieved: construction of Silo's by slip forming technique, big mass concrete foundation at the port area for pumping station at mesaeed industrial port, also classical structure and building frame work, slab, shear wall, big columns for alumina factory.
Duties:
• Assist the engineering & project process to achieve the operations in the time according to the planning and company requirements and project specifications.
• Verify that project contract requirements are in line with company quality requirements, objectives and systems.
• Ensure the availability of necessary quality documents with latest version on site, such as procedures and technical documents.
• Prepare quality reports, if necessary.
• Evaluate and identify the non-compliances to the company and project specifications, open NCRs and propose solutions and follow the progress of actions to close NCR.
• Promote internal audits, apply annual audit plan, organize and lead audits (prepare checklists if necessary and all necessary document for audits) and site visits, subcontractors and suppliers in order to evaluate the improvement progress.
• Make sure that all records were done according to company policy; ensure that the traceability is respected.
• Ensure the coordination and respect of the inspection test plan on site by 3rd party laboratories.
• Examination of incoming QA/QC reports & materials testing reports; provide recommendations and follow-up their execution.
• Examination of invoices (laboratory testing and hired technicians working timesheet).
• Supervising and follow up of the site lab activities, Equipment calibration follow-up.
• Examination of the request for inspection (RFIs) before sending to the consultant.
• Achievement of quality activities and material daily inspections.
• Follow-up of the RFIs status progress.
• Coordination and follow up with other departments for the corrective actions needed in case of comments or rejection of the RFIs.
• Material approval request (MAR) and Equipment inspection plan (EIP).
• Examination of the EIP and MAR documents before submitting them to the consultant.
• Follow-up and record EIP and MAR status progress.
• Ensuring the good and correct application of the EIPs on site.
• Technical coordination with various sub-contractors as CCIC, Astaldi Arabia, Al Jaber, Tozzi, GCC, Alsac and materials suppliers (concrete plants (trial mix and calibration) as the CCIC, Alfamix, AlQualah, and Ready Mix Beton Qatar ready mix and sand and aggregates suppliers).
• Conduct weekly meetings with contractors to evaluate the quality process Improvements.
• Coordinate with QA/QC contractor’s regarding quality activities and maintain records, ensuring that responses are complete and in compliance with the contract documents, where problems are found, work with Project Engineers to resolve them.
• Supervision QA/QC Engineers and Material Inspectors, provide them all necessary support.
• Promote team working and professional behaviour.
• Ensure the compliance of quality team to HSE specifications, procedures and policy.
Duties:
• Supervising lab Engineers and Material Technicians, provide them with requested support.
• Laboratory Quality Plan elaboration, implementation and follow-up.
• Procedures elaboration according to the Qatari standards, implementation and follow up.
• Ensure to provide technical support to commercial staff on daily basis.
• Participate in important meetings with local authorities.
• Participate in Qatari standards and Ashghal seminars.
• Evaluate and identify the non-compliances, open NCRs and propose solutions and follow the progress of actions to close NCRs, provide supplementary recommendations, if necessary.
• Actively promote the internal and external audits, elaborate the annual audit plan, organize and lead audits (prepare checklists and all necessary documents for the audits) site visits with subcontractors, suppliers in order to evaluate the improvement progress.
• Make sure that all records were done according to company policy; ensure that the traceability is respected.
• Examination of incoming quality reports & material testing reports and inform key persons about the deficiency, if exist, and propose solutions/quick actions and follow-up their execution.
• Coordination with clients and them consultants for the quality process Improvements.
• Manage the day-to-day operations of Laboratory staff.
• Maintain the calibration status of laboratory instruments.
• Manage inventory of lab supplies and equipment.
• Ensure good progress of staff training such as QC & Lab Engineers and Technicians.
ACC was a part of the Group Orascom Construction Industries (OCI).
One year in Cairo and 3 years in Algeria.
Duties:
• Actively participate in internal audits as Lead Internal Auditor.
• Ensure the conformity of raw materials, packaging materials and final products to standards.
• Manage day-to-day operations of Quality Control Laboratory.
• Supervise and conduct final product testing as per specifications.
• Maintain the calibration status of laboratory instruments.
Duties:
• Supervise operations & works of subcontractors on site to ensure that company makes benefits and achieves projects in compliance with to French specifications.
|