What is Design Project Management

  • What is Design Project Management

  • Organization of Senior Design

    • RIT
    • INSA
  • The objective of the exchange

  • What kind of project is it ?





We learn:

  • We learn:

  • To behave in group

  • To take the role of leader

  • To create a Specifications

  • To create and organize a schedule

  • DPM course form students to be some future manager





Student team that will carry out the project develop DPM

  • Student team that will carry out the project develop DPM

  • Team manager by a student of DPM

  • Possibility of using all technology available on condition that it would remain in the budget

  • Three months to the theoretical study and 3 other month to the realization,



400 students per year

  • 400 students per year

  • 50 projects

    • Each are different
    • 6 or 7 are in relation with “robotic platform”
  • 6 students per team

  • Production of the project



Project begin at the middle of the first semester

  • Project begin at the middle of the first semester

  • Realization of the theoretical study

  • Make the project on computer (CAD)

  • Make some manufacturing ranges

  • Possibility of using all technology available

  • 8 months to realize the project.



40 students per year

  • 40 students per year

  • One project given by our teachers

    • All team work on the same project
    • Teams have to make different systems
  • 4students per team

  • Presentation of each project for an eventual production





The project thus over several years

  • The project thus over several years

  • Courses will not change in either school

  • Only the topic of the subject changes



Working with people from another country

  • Working with people from another country

  • Getting acquainted with the other method, units…

  • Strengthen international work

  • Know another method of work

  • collaboration between ideas and technologies

  • Allow to exchange our experiences and ideas

  • Solve problems in a different way

  • Helping students to have an international role





Throughout these three months we studied and worked out a schedule of conditions on a project called "motor module" so that this module can transport a load of 1 kg.

  • Throughout these three months we studied and worked out a schedule of conditions on a project called "motor module" so that this module can transport a load of 1 kg.

  • We had at our disposal of the "motor module" for loads of 10 and 100 kg.





RIT Senior Design Team completes 10 motor module

  • RIT Senior Design Team completes 10 motor module

  • Faculty guide will choose the most promising robot

  • This robot will be sent to INSA de Rennes

  • The French project team will improve the robot by adding the suspension





For next the 3 months our objective is:

  • For next the 3 months our objective is:

  • ○ To follow the 5 teams which will carry out the "motor module", to take part in the development of this project.

  • ○ Then to carry out a schedule of conditions for French student so that they improves the module the following year.