1.
|
Project Name
|
Kabeli-A Hydroelectric Project
|
2.
|
Location
|
Amarpur and Panchami VDCs of Panchthar District and Thechambu and Nangkholyang of Taplejung District
|
2.1
|
Project Boundaries
|
East 87° 45' 50" E
West 87° 40' 55" E
North 27° 17' 32" N
South 27° 13' 41" N
|
3
|
Type of Development
|
Peaking Run-of-the-river (PROR)
|
4
|
Hydrology at intake
|
|
|
Catchment area
|
862.3 km2
|
|
100 year flood (Q100)
|
1860 m3/s
|
|
Probable maximum flood (Q1000)
|
2650m3/s
|
|
Mean monthly flow
|
61.4 m3/s
|
|
40 percentile flow
|
37.73 m3/s
|
|
Monsoon Design Discharge
|
40 m3/s
|
5.
|
Headworks
|
|
|
Type/Length of weir/height
|
Barrage with 4 radial gates; 3 weir bays and one sluice bay
|
|
Full supply level
|
575.3 m
|
|
Peaking reservoir net live storage capacity
|
0.335 million m3
|
|
Crest elevation
|
561.5masl for barrage bays and 561.0 for sluice bay
|
|
Gate Size
|
10 m Width * 9.0 m Height each
|
|
Intake type
|
Tunnel intake on left bank
|
|
Intake size at trash rack
|
2 nos. 5.4m Width * 5.8m Height
|
|
Riparian/downstream Release
|
0.86 m3/s (10% of average monthly minimum)
|
6.
|
Diversion during construction
|
|
|
Diversion flood (5 year dry season flow)
|
154 m3/s
|
|
Diversion tunnel
|
240m long; 4.8m diameter D-shaped tunnel
|
|
Coffer Dams
|
80m at upstream side
90m long at downstream side
|
7.
|
Approach Tunnel from Intake to Settling Basin
|
|
|
Number
|
2 (1 each starting from either intake)
|
|
Length
|
80.9 m
|
|
Type
|
Inverted D shaped; Concrete lined
|
|
Cross section
|
Internal Finished Diameter 3.2 m
|
8.
|
Settling basin
|
|
|
Type
|
Underground settling basin
|
|
Number
|
2 basins with 2 hoppers in each
|
|
Length of uniform section
|
76 m
|
|
Total length including transition
|
113 m
|
|
Width
|
15.8 m each
|
|
Height
|
17 m
|
|
Flushing system
|
S4 system
|
|
Flushing tunnel length and size
|
150 m long; 2.25 m D-shaped tunnel with 1.75 m dia. MS pipe
|
9.
|
Access tunnel
|
|
|
Length
|
437 m
|
|
Type
|
Inverted D shaped; shotcrete and rock bolt lined
|
|
Cross section
|
Internal diameter 4 m
|
10.
|
Waterways
|
|
10.1
|
Covering Pair Tunnels from outlet of settling basin to start Headrace Tunnel
|
|
|
Length
|
60.2 m
|
|
Type
|
Inverted D shaped; Concrete lined
|
|
Cross section
|
Internal Finished Diameter 3.2 m
|
10.2
|
Headrace Tunnel
|
|
|
Length after pair tunnels
|
4327 m
|
|
Type
|
Inverted D shaped; Shotcrete lined and Concrete lined
|
|
Cross section
|
Internal Finished Diameter 5.65 m
|
10.3
|
Surge Shaft
|
|
|
Type
|
Underground and exposed to surface
|
|
Internal diameter
|
10 m
|
|
Height
|
51.7 m
|
10.4
|
Penstock
|
|
|
Material
|
Mild steel
|
|
Length before bifurcation
|
223.3 m
|
|
Length after bifurcation
|
27.2 m each
|
|
Internal Diameter
|
3.55 m
|
|
Shell Thickness
|
10-20 mm; partly ribbed
|
11
|
Powerhouse
|
|
|
Powerhouse type
|
Semi-underground
|
|
Powerhouse size (L*B*H)
|
34.8 x 18.6 x 31.8 m
|
12
|
Tailrace
|
|
|
Design tailwater level
|
458.5 masl
|
|
Length
|
93.1 m
|
|
Cross-section
|
4.9 m wide * 4.65 m high Rectangular box culverts
|
|
Longitudinal slope
|
1 in 1500
|
|
100 year flood (Q100) in Tamor River
|
5800 m3/s
|
|
Probable maximum flood (Q1000) in Tamor River
|
8260 m3/s
|
13.
|
Turbine
|
|
|
Turbine type
|
Vertical Axis Francis
|
|
Number of units
|
2
|
|
Rated speed
|
375 rpm
|
|
Turbine Axis Level
|
457.64 masl
|
14.
|
Power and energy output
|
|
|
Gross head
|
116.8 m
|
|
Rated net head
|
111.64 m
|
|
Design discharge
|
37.73 m3/s
|
|
Installed capacity
|
37.6 MW
|
|
Annual estimated energy per excluding 6% outage
|
201.0 GWh
|
|
Firm energy excluding outage
|
149.4 GWh
|
|
Secondary energy excluding outage
|
51.6 GWh
|
15.
|
Transmission line (Not part of the project)-to be built by NEA
|
|
|
Voltage
|
132 kV
|
|
Length
|
83.74 km
|
16.
|
Access road
|
|
|
To headworks
|
7.4 km from Dhubichaur at Mechi highway
|
|
To powerhouse
|
15 km from Bhanuchowk at Mechi Highway
|
17.
|
Project Cost
|
|
|
Total cost
|
70.84 Million US$
|
|
Per kW cost
|
1884 US$
|
18.
|
Financial analysis
|
|
|
Net present value (NPV)
|
13.09 Million US$
|
|
Simple payback period
|
6.9 years
|
|
Return of interest (RoE)
|
15.38 %
|
|
Internal rate of return (IRR)
|
12.71 %
|