Contents preface (VII) introduction 1—37



Yüklə 18,33 Mb.
səhifə233/489
tarix03.01.2022
ölçüsü18,33 Mb.
#50422
1   ...   229   230   231   232   233   234   235   236   ...   489
Discharge Verification. The discharge passing through the head regulator is normally worked out from discharge rating curves (tables) prepared by model experiments, both for free-fall and drowned conditions. This needs verification at site by current meter, etc. In case of significant variation, rating curves (tables) need to be modified in consultation with the research unit.




  1. Energy dissipating devices downstream of the Head Regulator. The performance of such devices should be monitored to check conformance with model results. In case of significant non-conformance, research unit should be consulted. Bank and bed protection of exit channel should be carried out regularly. Routine repairs should be done during closures, and emergency repairs may be undertaken as called for.



Yüklə 18,33 Mb.

Dostları ilə paylaş:
1   ...   229   230   231   232   233   234   235   236   ...   489




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin