Sbd works (ncb)



Yüklə 1,7 Mb.
səhifə136/140
tarix20.05.2023
ölçüsü1,7 Mb.
#127287
1   ...   132   133   134   135   136   137   138   139   140
1 FOR PRINT UNION BID DOC

GCC 79.2

The technical rules for drawing up the statements shall be: [Specify the technical rules for drawing up the statements]

GCC 80.2

The works, components, equipment and materials used in their construction must comply with:
(rrrrrrrrrrrr)The following specifications [list specifications];(a) The following specifications; as per the rules in the MoC Technical
Specification for Building Works 2014, ERA standard 2013 and Bill of Quantities
(ssssssssssss)The requirements of [Specify the technical document(s) containing these requirements]

GCC 80.3

[Specify whether preliminary technical acceptance is necessary and the conditions governing its implementation]

GCC 81

[Specify the places to be inspected and tested in accordance with GCC Clause 81 and the practical arrangements for testing]

GCC 83.2

[Specify if the equipment, temporary structures, plant and materials on the Site belong to the Public Body under GCC Clause 81 and the legal instrument(s) used]




  1. Acceptance and Defects Liability

GCC 86.3

[Specify whether the Defects Liability Period begins if this does not run from the date of partial acceptance]

GCC 87

[Specify detailed arrangements for provisional acceptance; if any]

GCC 88.6

[Specify if the defects liability work necessitated by normal wear and tear is to be carried out by the Contractor]

GCC 88.7

[Specify if the duration of the defects liability period is less than the maximum of 365 days. Specify any additional obligations under the warranty, e.g. commercial warranty]


    1. Contract Forms


Yüklə 1,7 Mb.

Dostları ilə paylaş:
1   ...   132   133   134   135   136   137   138   139   140




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2025
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin