Ag. Item
|
Tdoc #
|
Source
|
Title
|
Spec
|
CR #
|
cat
|
Rel
|
Comments for tdocs handled by e-mail
|
Conclusion
|
6OSA
|
S2-001301
|
Lucent
|
Service control architecture
|
|
|
|
|
|
Handled by OSA drafting group.
|
6OSA
|
S2-001302
|
Lucent
|
Service flow list
|
|
|
|
|
|
Handled by OSA drafting group.
|
|
S2-001303
|
Lucent
|
SIP with QoS
|
|
|
|
|
|
Noted by QoS drafting.
|
5.2
|
S2-001312
|
Ericsson
|
Introduction of functional elements from 23.821 into 23.002
|
23.002
|
020
|
B
|
R00
|
9/15/00 (Laurent Thiebaut, Alcatel): Objection, Revisions
9/15/00 (Frank Mademann, Siemens): Revisions
9/15/00 (Liz Daniel, Lucent Technologies): Objection
9/22/00 (Romeo Zwart, AT&T): Objection
9/22/00 ((Laurent Thiebaut, Alcatel): Objection
|
Not approved.
|
5.2
|
S2-001316
|
Lucent
|
Revised Information Flow Template
|
|
|
|
|
|
Encompassed by the previous document.
|
1
|
S2-001350
|
Chairman
|
Agenda
|
|
|
|
|
|
Approved.
|
1
|
S2-001351
|
MCC
|
Minutes of S2’s drafting meeting in Vancouver
|
|
|
|
|
|
Noted (already approved by e-mail).
|
7
|
S2-001352
|
MCC
|
Work Plan v. Aug. 25
|
|
|
|
|
|
Noted.
|
4
|
S2-001353
|
Alcatel/CN2
|
Detailed on Camel interworking with SGSN (SGSN CAMEL procedures)
|
23.060
|
169
|
F
|
R99
|
|
Editorially revised to S2-001530.
|
6 LCS
|
S2-001354
|
Siemens
|
Alignment of Geographic Shape Description with ITU-T and ANSI
|
03.32
|
A007
|
F
|
R98
|
|
Handled by LCS drafting group.
|
6 LCS
|
S2-001355
|
Siemens
|
Alignment of Geographic Shape Description with ITU-T and ANSI
|
23.032
|
002
|
F
|
R99
|
|
Handled by LCS drafting group.
|
5
|
S2-001356
|
Hughes network systems
|
Proposal for V.44 Data Compression in SNDCP
|
|
|
|
|
|
Not approved.
|
5
|
S2-001357
|
Hughes network systems
|
Proposal for V.44 Data Compression in PDCP
|
|
|
|
|
|
Not approved.
|
6 OSA
|
S2-001358
|
VHE/OSA ad-hoc
Group
|
Minutes of the VHE/OSA Drafting Meeting of Montreal (August)
|
|
|
|
|
|
Approved. It asks for approval of the three following LSs (S2-001359, 1360 and 1361).
|
6 OSA
|
S2-001359
|
VHE/OSA ad-hoc
Group
|
Proposed LS to S1 and N5 on terminology in OSA specifications
|
|
|
|
|
|
Editorially revised to S2-001639
|
6 OSA
|
S2-001360
|
VHE/OSA ad-hoc
Group
|
Proposed LS to S1 and N5 on work split between SA 1, SA 2 and CN 5
|
|
|
|
|
|
Approved.
|
6 OSA
|
S2-001361
|
VHE/OSA ad-hoc
Group
|
Reply LS to S1 ( Cc T2-1, N2, WAP WAG Sync, T3, S3) on Support of VHE User Profiles
|
|
|
|
|
|
Approved.
|
4
|
S2-001362
|
Vodafone
|
DTM: simultaneous LAU and RAU procedures on an SDCCH
|
23.060
|
170
|
F
|
R99
|
|
Approved.
|
4
|
S2-001363
|
Vodafone
|
Withdrawn
|
23.060
|
171
|
?
|
?
|
|
Revised to S2-001523
|
4
|
S2-001364
|
Vodafone
|
Withdrawn
|
23.060
|
172
|
?
|
?
|
|
Revised to S2-001524
|
6QoS
|
S2-001365
|
Nokia
|
End-to-End QoS Notifications between UE and GGSN
|
23.107
|
025
|
B
|
R00
|
|
Not approved. Handled by QoS drafting group.
|
5.3
|
S2-001366
|
Ericsson
|
23.226 Global Text telephony, Stage 2
|
23.226
|
|
|
|
|
Noted.
|
5.3
|
S2-001367
|
Ericsson
|
Global Text Telephony status and planning
|
23.226
|
|
|
|
|
23.226 cannot be raised to v.1.0. Companies are invited to contribute on the issue.
|
5.3
|
S2-001368
|
Ericsson
|
22.226 Global Text telephony Stage 1
|
22.226
|
|
|
|
|
Noted.
|
|
S2-001369
|
Korea Telecom
|
Withdrawn
|
|
|
|
|
|
|
6QoS
|
S2-001370
|
Fujitsu
|
Introduction of packet delay variation
|
|
|
|
|
|
Not Approved. Handled by QoS drafting group.
|
4
|
S2-001371
|
Ericsson
|
CS Paging procedure in UMTS
|
23.060
|
173
|
F
|
R99
|
|
Approved.
|
4
|
S2-001372
|
Ericsson
|
Clarification on P-TMSI and P-TMSI signature at Detach
|
23.060
|
174
|
F
|
R99
|
|
Approved.
|
4
|
S2-001373
|
Ericsson
|
Serving RNS Relocation Procedure
|
23.060
|
175
|
F
|
R99
|
|
Editorially revised to S2-001532.
|
4
|
S2-001374
|
Ericsson
|
DRX and MS network capabilities within UMTS
|
23.060
|
176
|
F
|
R99
|
|
Editorially revised to S2-001533
|
2
|
S2-001375
|
Vice Chairman
|
Status of S2 E-mail approval between S2#13 and S2#14
|
|
|
|
|
|
Alcatel sent some comments on CSCF discovery, but too late (after the deadline).
S2-001252, 1259 and 1261 were supposed to be approved by e-mail, but they are asked to be approved now: to be approved by Wednesday if no objection is made.
|
6LCS
|
S2-001376
|
Editor (Nokia)
|
Functional stage 2 description of LCS
|
23.271 v. 0.1.0
|
|
|
|
|
Handled by LCS drafting group.
|
6split
|
S2-001377
|
WI rapporteur (Ericsson)
|
Minutes of Split Architecture Drafting in Stockholm
|
23.873
|
|
|
|
|
For SGSN split drafting group.
|
6split
|
S2-001378
|
WI rapporteur (Ericsson)
|
TR 23.873 v0.1.0
|
23.873 v0.1.0
|
|
|
|
|
Approved.
|
6QoS 3
|
S2-001379
|
S1-000503
|
LS on Service Modification without Pre-Notification
|
|
|
|
|
|
For QoS drafting group: handled together with next document.
|
3
|
S2-001380
|
S1-000567
|
LS to VHE/OSA on Support of VHE User Profiles
|
|
|
|
|
|
Handled by OSA drafting group.
|
3
|
S2-001381
|
S1-000616
|
LS on Response to comments on TR22.976 (v1.4.0)
|
|
|
|
|
|
Noted.
|
3
|
S2-001382
|
S1-000609
|
LS Cc S2 on “Priority of ME resources for WAP and SIM toolkit applications”
|
|
|
|
|
|
Noted.
|
3
|
S2-001383
|
S1-000611
|
LS on Applications on external devices (response to Tdoc SP-00353)
|
|
|
|
|
|
Handled with S2-001505. T2 has answered (we’re missing they reply). The original SA LS has also to be found out.
|
3
|
S2-001384
|
N4-000520
|
Response LS on Terminology of TrFO/TFO and possible interworking scenarios
|
|
|
|
|
|
Proposed answer in S2-001662.
|
3
|
S2-001385
|
N4-000507
|
LS on appointment of people to maintain liaison with IGC
|
|
|
|
|
|
Noted.
|
3
|
S2-001386
|
N4-000549
|
LS on Architectural Impact of Combined MAP Signaling for Mobility Management
|
|
|
|
|
|
An answer is generated based on these inputs in S2-001608.
|
|
S2-001387
|
N4-000515
|
LS (Cc S2) on request for response to N4 LS (N4-000340)
|
|
|
|
|
9/18/00 (Yukio Hiramatsu, S2 Vice Chair): Suggestion for no action.
|
S2’s chairman has to contact N1’s chairman to check if S2 is still requested to perform some actions. No Action
|
3
|
S2-001388
|
N2-000344
|
LS on IPT Basic Call Handling
|
|
|
|
|
|
Proposed answer in S2-001515.
|
3
|
S2-001389
|
R3-001963
|
LS on RAB Assignment QoS Negotiation
|
|
|
|
|
|
Handled together with next LS. Handled by QoS drafting group.
|
3
|
S2-001390
|
R3-001998
|
LS response on support of AMR via Iu-ps in GERAN
|
|
|
|
|
|
An answer will be provided in S2-001516.
|
3
|
S2-001391
|
R2-001533
|
LS response (R3-001581) on SRNS Relocation of RT RABs and interaction with PDCP
|
|
|
|
|
|
Noted.
|
3
|
S2-001392
|
R1- 000765
|
LS on ‘Proposed changes to 3GPP Release 2000 work plan’
|
|
|
|
|
|
To be included in the next version of the Work Plan by IGC convenor or by MCC.
|
3
|
S2-001393
|
N2-000194
|
LS on Proposed updates to Work Plan Version 1.0 relating to CAMEL Phase 4 work item
|
|
|
|
|
|
To be included in the next version of the Work Plan by IGC convenor or by MCC.
|
5.2
|
S2-001394
|
Alcatel
|
External IP Call Termination Points
|
23.228
|
|
|
R00
|
|
For Call flow drafting group.
|
5.3
|
S2-001395
|
Alcatel
|
Local service
|
23.228
|
|
|
R00
|
|
Withdrawn
|
5.2
|
S2-001396
|
Alcatel
|
Routing (CS/PS) of incoming calls
|
23.228
|
|
|
R00
|
|
None of these 2 contributions are approved. More discussions are needed.
|
5
|
S2-001397
|
Alcatel
|
Use of Iur and Iu-ps interfaces – Handovers
|
|
|
|
R00
|
|
Proposed answer to S2-001609 in S2-001613. To be decided later on, based on its content, whether it has to be sent or not.
For the other questions of S2-001609, a drafting group is established.
|
5
|
S2-001398
|
Alcatel
|
Handover and RAN Relocation for the GERAN (companion of S2-001397)
|
23.121
|
058
|
|
R00
|
|
Withdrawn, due to the lack of agreement on S2-001397.
|
|
S2-001399
|
Alcatel
|
Removal of unnecessary features of Cx interface
|
23.228
|
|
|
|
None
|
Approved For e-mail approval..
|
5.1
|
S2-001400
|
Alcatel
|
P-CSCF discovery
|
23.228
|
|
|
R00
|
|
Not approved: the conclusion is still to use DHCP, as agreed in Vancouver.
|
WI
|
S2-001401
|
Alcatel
|
Impacts of SGSN split
|
|
|
|
R0x
|
|
|
5.3
|
S2-001402
|
Alcatel
|
|
23.228
|
|
|
R00
|
|
|
5.3
|
S2-001403
|
Alcatel
|
Use of Firewall CSCFs (role of I-CSCF)
|
23.228
|
|
|
R00
|
|
Handled by drafting.
|
|
S2-001404
|
Alcatel
|
Iu user plane in the CS core network
|
Revised Tdoc
|
|
|
|
|
|
5
|
S2-001404
|
Alcatel
|
Iu user plane in the CS core network
|
|
|
|
|
None
|
Approved.
|
3
|
S2-001405
|
N1-000639
|
LS to R3 (Cc S2) on including the SAI into the Gs-i/f BSSAP+-LOCATION-UPDATE-REQUEST message as requested in N1-000543
|
|
|
|
|
|
Noted.
|
3
|
S2-001406
|
N1-000758
|
LS on Removal of Service Accept
|
|
|
|
|
|
Obsolete: the CR 184 in S2-001638 is already the compromise solution found at last N1 meeting.
|
3
|
S2-001407
|
N1-000712
|
LS on Terminal capability negotiation including codecs (reply)
|
|
|
|
|
|
Noted.
|
3
|
S2-001408
|
N1-000713
|
LS response on hexadecimal IMEI format
|
|
|
|
|
|
Noted.
|
3
|
S2-001409
|
N1-000793
|
LS to S2 on 23.060 CR “Change of the Cell update procedure”
|
23.060
|
147r1
|
F
|
R99
|
|
Approved (after checking that it is possible to include it as such in v.3.4).
|
3
|
S2-001410
|
N3-000278
|
LS on Service Modification without pre-notification
|
|
|
|
|
|
Proposed answer in S2-001518.
|
3
|
S2-001411
|
R3-001578
|
LS on Progress of Real-Time PS Domain SRNS Relocation
|
|
|
|
|
|
Proposed answer in S2-001519.
|
3
|
S2-001412
|
R3-001581
|
LS to R2 and S2 on Relocation interaction with PDCP
|
|
|
|
|
|
Noted.
|
3
|
S2-001413
|
R3001649
|
LS Response on hexadecimal IMEI format
|
|
|
|
|
|
Noted: S1 accepts these changes in S2-001408.
|
3
|
S2-001414
|
SMG9-00262
|
LS on Priority of ME resources for WAP and SIM toolkit applications
|
|
|
|
|
|
Noted.
|
3
|
S2-001415
|
S5-000320
|
LS on Protocol Choice for Layer I of MAP Security
|
|
|
|
|
|
Noted.
|
3
|
S2-001416
|
S5-000322
|
LS on Service Management – New R00 work item proposal under SA5’s responsibility
|
|
|
|
|
|
Not approved.
|
3
|
S2-001417
|
S5-000353
|
LS on 2G/3G QoS profiles
|
|
|
|
|
|
Proposed answer in S2-001566. Handled by QoS drafting group.
|
3
|
S2-001418
|
S3-000478
|
LS to S2 on use of IP for security key distribution
|
|
|
|
|
|
Noted. To be kept in mind when further progressing the work.
|
3
|
S2-001419
|
T2M000089
|
LS on VHE/OSA presentation
|
|
|
|
|
|
Too late.
|
3
|
S2-001420
|
T2M000090
|
LS on Terminal Capability Negotiation
|
|
|
|
|
|
Noted.
|
3
|
S2-001421
|
N4-000549
|
LS on Architectural Impact of Combined MAP Signaling for Mobility Management
|
|
|
|
|
|
Withdrawn.
|
3
|
S2-001422
|
S1-000651
|
LS on Re-establish Capability for Emergency call
|
|
|
|
|
|
Proposed answer in S2-001520.
|
3
|
S2-001423
|
S1-000658
|
LS (Cc S2) on Guidance on future work for T2 SWG5, Multi-mode terminals
|
|
|
|
|
|
Noted.
|
3
|
S2-001424
|
R2-001859
|
LS on Corrections to relocation procedures in 23.060
|
23.060
|
|
F
|
R99
|
|
Revised CR in S2-001521.
Proposed LS back in S2-001522.
|
3
|
S2-001425
|
R2-001817
|
LS response to R3-002198 on Directed signalling connection re-establishment at RRC
|
|
|
|
|
|
Proposed answer in S2-001527.
|
3
|
S2-001426
|
R2-001865
|
LS response to S2-001053 on “Two phase resource reservation”
|
|
|
|
|
|
Noted.
|
3
|
S2-001427
|
R2-001868
|
LS (Cc S2) on Answer to Proposal of exchange of the terms “in GSM” and “in UMTS”
|
|
|
|
|
|
Noted.
|
3
|
S2-001428
|
R2-001870
|
LS on Failure during SRNS Relocation
|
|
|
|
|
|
Proposed answer in S2-001529.
|
3
|
S2-001429
|
T3-000435
|
LS to S2 VHE/OSA on Support of Bookmarks / VHE User Profiles
|
|
|
|
|
|
Handled by OSA drafting group.
|
3
|
S2-001430
|
T3-000470
|
LS on Clarification of UMTS-AKA for GSM R’99 Mobiles
|
|
|
|
|
|
Noted.
|
3
|
S2-001431
|
Tiphon
|
Presentation of Tiphon
|
|
|
|
|
|
Noted.
|
3
|
S2-001432
|
Tip 19TD129
|
LS on TIPHON architecture document
|
|
|
|
|
|
Noted.
|
3
|
S2-001433
|
Tiphon
|
Document DTS-02003v0.10.10
|
|
|
|
|
|
Noted.
|
3
|
S2-001434
|
N1-000997
|
LS on Answer to Proposal of exchange of the terms “in GSM“ and “in UMTS“
|
|
|
|
|
|
Accepted. A proposed answer is provided in S2-001528.
|
3
|
S2-001435
|
N1-001023
|
LS on the introduction of GEA2.
|
|
|
|
|
|
Approved. The editor should check that this decision does not impact 03.60 and 23.060.
|
5.2
|
S2-001436
|
Telia
|
Ungraceful session termination in the IM domain
|
|
|
|
|
|
The requirements are expressed in S2-001602, and a LS to N1 is proposed in S2-001603.
|
5
|
S2-001437
|
Siemens
|
CSCF Availability during the SIP Session
|
|
|
|
|
|
Revised to S2-001632 to keep only the requirements.
|
5.1
|
S2-001438
|
Siemens
|
CSCF Availability at Session Setup
|
|
|
|
|
|
Not approved as such.
|
4
|
S2-001439
|
Siemens
|
Compatibility GTPv0/GTPv1 in case of SGSN change
|
23.060
|
177
|
F
|
R99
|
|
Editorially revised to S2-001531.
|
6LCS
|
S2-001440
|
Qualcomm
|
The support of an open interface to the SMLC within the 3GPP UTRAN LCS
Specifications
|
|
|
|
|
|
Handled by LCS drafting group.
|
3
|
S2-001441
|
S1-000679 (not yet approved)
|
LS to RAN2 (Cc S2) regarding Open Interfaces within the UTRAN for LCS Support
|
|
|
|
|
|
Handled by LCS drafting group.
|
5.1
|
S2-001442
|
BT
|
Revised proposal for registration flows
|
|
|
|
|
|
A general conclusion will be made on all the contributions dealing with registration flow.
|
5.2
|
S2-001443
|
BT
|
|
|
|
|
|
|
For Call flow drafting group.
|
5.2
|
S2-001444
|
BT
|
|
|
|
|
|
|
For Call flow drafting group.
|
6QoS
|
S2-001445
|
Ericsson
|
IP Specific Elements in PDP Context Activation/Modification
|
|
|
|
|
|
Handled by QoS drafting group.
|
6QoS
|
S2-001446
|
Ericsson
|
Resource manager
|
|
|
|
|
|
Not approved. Handled by QoS drafting group.
|
6QoS
|
S2-001447
|
Ericsson
|
QoS End-to-End Functional Architecture (that is an update of CR23 to 23.107)
|
|
|
|
|
|
Handled by QoS drafting group.
|
5.2
|
S2-001448
|
Marconi
|
Mobile Originated SIP based Call Flows
|
|
|
|
|
|
For Call flow drafting group.
|
5.2
|
S2-001449
|
AT&T
|
Call Flow Definitions
|
|
|
|
|
|
For Call flow drafting group.
|
5.3
|
S2-001450
|
Lucent
|
Term to describe RAN+SGSN+GGSN
|
|
|
|
|
9/18/00 (Liz Daniel, Lucent Technologies): Support
9/18/00 (Juan-Antonio Ibanez, Ericsson): Modified term
9/18/00 (Liz Daniel, Lucent Technologies): Comments to Juan
9/18/00 (Juan-Antonio Ibanez, Ericsson): Withdrawal
9/18/00 (Jie Feng, 3COM): Modified term
9/19/00 (Ray Forbes, Marconi): Support for Ericsson
9/20/00 (Liz Daniel, Lucent Technologies): Proposed definition of term
9/20/00 (Ray Forbes, Marconi): New proposal
9/21/00 (Liz Daniel, Lucent Technologies): Clarification to Ray
9/21/00 (Ray Forbes, Marconi): Response to Liz
9/21/00 (Ray Forbes, Marconi): Proposed definition of term
|
Not approved.
|
5
|
S2-001451
|
Lucent
|
TS 23.228 V0.1.0 IM Subsystem Stage 2
|
|
|
|
|
|
|
5.1
|
S2-001452
|
Lucent
|
Serving CSCF Assignment
|
|
|
|
|
|
Handled by the drafting group on Registration.
|
5.1
|
S2-001453
|
Lucent
|
Registration/Deregistration Information Flows
|
|
|
|
|
|
Not Approved. Handled by the drafting group on Registration.
|
5.1
|
S2-001453
|
Lucent
|
Registration/Deregistration Information Flows
|
|
|
|
|
|
Not Approved. More contributions are needed on de-registration before a conclusion can be taken. Contributions are invited on this topic at next meeting.
|
5.2
|
S2-001454
|
Lucent
|
Mobile Origination Information Flows
|
|
|
|
|
|
For Call flow drafting group.
|
5.2
|
S2-001455
|
Lucent
|
Mobile Termination Information Flows
|
|
|
|
|
|
For Call flow drafting group.
|
5.2
|
S2-001456
|
Siemens
|
Mobile Terminated Call Routing between IMS and CS
|
|
|
|
|
|
See conclusion on S2-001396, presenting another solution to the same problem.
|
5.3
|
S2-001457
|
NTT Commware
|
Draft TR on Feasibility study on architecture for network requested PDP contextactivation with User-ID
|
23.8xx
|
|
|
|
|
For e-mail approval. Revised later on during this meeting.
|
4
|
S2-001458
|
NTT Commware
|
Correction on Iu Release Procedure
|
23.060
|
178
|
F
|
R99
|
|
Revised to S2-001607.
|
5
|
S2-001459
|
NTT Commware
|
Introduction of Integrated Serving Node
|
23.002
|
021
|
B
|
R00
|
|
Not approved: information for CN is expected before.
|
5.1
|
S2-001460
|
Ericsson
|
Serving CSCF Selection Function
|
|
|
|
|
|
Handled by the drafting group on Registration.
|
5.1
|
S2-001461
|
Ericsson
|
Architectural Principles for Release 2000
|
23.121
|
|
B
|
R00
|
|
|
5.1
|
S2-001462
|
Ericsson
|
Triggering the CSCF Selection Function. Home Network Control case.
|
|
|
|
|
|
Handled by the drafting group on Registration.
|
5.1
|
S2-001463
|
Ericsson
|
Triggering the CSCF Selection Function. Visited Network Control case.
|
|
|
|
|
|
Also not approved.
|
5.1
|
S2-001464
|
Ericsson, Nokia, Vodafone
|
Clarification of HSS Role in SIP Registration procedure
|
|
|
|
|
|
Not approved. The flows need to be elaborated first: the text leads to endless discussions.
|
5.1
|
S2-001465
|
Ericsson
|
Registration procedures
|
|
|
|
|
|
Handled by the drafting group on Registration.
|
5.2
|
S2-001466
|
Ericsson
|
- not provided -
|
|
|
|
|
|
For Call flow drafting group.
|
5.2
|
S2-001467
|
Ericsson
|
ENUM and TRIP protocols in 3GPP R’00
|
|
|
|
|
|
Not approved. Ericsson can come back with a contribution on how to bring these protocols in the architecture.
|
5.2
|
S2-001468
|
Ericsson
|
- not provided -
|
|
|
|
|
|
For Call flow drafting group.
|
5.3
|
S2-001469
|
Ericsson
|
HSS Role as VLS
|
|
|
|
|
9/15/00 (Laurent Thiebaut, Alcatel): Objection.
9/15/00 (Liz Daniel, Lucent Technologies): Concerns and editorials.
9/15/00 (Brian Yarger, Tellabs): Concerns
9/18/00 (Stephen Terril, Ericsson): Request for extension of deadline
9/18/00 (Stephen Terril, Ericsson): Rebuttal
9/20/00 (Liz Daniel, Lucent Technologies): Support for extending deadline
9/29/00 (Laurent Thiebaut, Alcatel): Objection
|
Not approved. Some written contributions are needed on this subject.
|
3
|
S2-001470
|
S1-000680 (not agreed yet)
|
LS to TSG-GERAN regarding Open Interfaces within the GERAN for LCS Support
|
|
|
|
|
|
Handled by LCS drafting group.
|
6LCS
|
S2-001471
|
Nokia
|
Editorial changes to 23.271
|
|
|
|
|
|
Handled by LCS drafting group.
|
6LCS
|
S2-001472
|
Nokia
|
On changes in PS LCS
|
|
|
|
|
|
Handled by LCS drafting group.
|
6LCS
|
S2-001473
|
Nokia
|
Moving Iu description from 23.171 to 25.305
|
23.171
|
003
|
|
R99
|
|
Handled by LCS drafting group.
|
5.2
|
S2-001474
|
Nokia
|
Role of the proxy CSCF after the registration procedure
|
|
|
|
|
|
Editorially revised to S2-001633
|
5.3
|
S2-001475
|
Nokia
|
Introducing flexibility to the Iu interface
|
|
|
|
|
9/15/00 (Frank Mademann, Siemens): Objections.
|
Not approved.
|
5.1
|
S2-001476
|
Lucent
|
Registration Models
|
|
|
|
|
|
Not approved.
|
4
|
S2-001477
|
Alcatel
|
Correction to Data Retrieve protocol stacks endpoints
|
23.121
|
059
|
|
R99
|
|
Replaced by 1512
|
5.3
|
S2-001478
|
Alcatel
|
Correction to Data Retrieve protocol stacks endpoints
|
23.121
|
060
|
|
R00
|
|
Replaced by 1513
|
6OSA
|
S2-001479
|
Ericsson
|
Change of TS 23.127 title for version 4.0 and up
|
23.127
|
011
|
D
|
R01
|
|
Handled by OSA drafting group.
|
6OSA
|
S2-001480
|
Ericsson
|
OSA stage 1 requirements to be addressed by S2
|
|
|
|
|
|
Handled by OSA drafting group.
|
5.2
|
S2-001481
|
AT&T
|
Annex X1 of 23.228 (Editorial update)
|
|
|
|
|
|
For Call flow drafting group.
|
5.1
|
S2-001482
|
AT&T
|
Multiple I-CSCF
|
|
|
|
|
|
Revised to S2-001540, with these changes.
|
5.3
|
S2-001483
|
AT&T
|
Proxy CSCF reassignement
|
|
|
|
|
9/23/00 (Nicholas Allen, Nortel Networks): Revisions
9/25/00 (Charles Kalmanek, AT&T): 1483 r1
|
Approved.
|
5.2
|
S2-001484
|
AT&T
|
Template for call flows
|
|
|
|
|
|
Approved. Used to be decided on a case by case basis.
|
5
|
S2-001485
|
AT&T
|
PS domain multiple RABs Real time HO requirements
|
|
|
|
|
|
An LS is generated in S2-001614.
|
6LCS
|
S2-001486
|
Fujitsu
|
- not provided -
|
|
|
|
|
|
Handled by LCS drafting group.
|
6LCS
|
S2-001487
|
Fujitsu
|
- not provided -
|
|
|
|
|
|
Handled by LCS drafting group.
|
6LCS
|
S2-001488
|
Fujitsu
|
- not provided -
|
|
|
|
|
|
Handled by LCS drafting group.
|
6LCS
|
S2-001489
|
Fujitsu
|
- not provided -
|
|
|
|
|
|
Handled by LCS drafting group.
|
5.2
|
S2-001490
|
Nokia
|
A definition on signalling PDP context
|
23.060
|
179
|
B
|
R00
|
|
Not approved.
|
4
|
S2-001491
|
Motorola
|
IP v6 address stateless autoconfiguration
|
23.060
|
180
|
F
|
R99
|
|
Not approved. Later revised to S2-001543.
|
6OSA
|
S2-001492
|
Motorola
|
- not provided -
|
|
|
|
|
|
Handled by OSA drafting group.
|
5.3
|
S2-001493
|
Motorola
|
Ipv4/Ipv6 Interworking Scenarios
|
|
|
|
|
|
Not approved and S2-001601 neither. More time is allowed for Nokia and Motorola to try to align their views.
|
5.3
|
S2-001494
|
Motorola
|
IP Address Management
|
|
|
|
|
|
Revised to S2-001643.
|
5.3
|
S2-001495
|
Motorola
|
Push Service
|
23.874
|
|
|
|
|
|
5.3
|
S2-001496
|
Motorola
|
Push Service Considerations
|
23.874
|
|
|
|
|
|
6QoS
|
S2-001497
|
Motorola
|
Attribute and parameter terminology
|
23.107
|
026
|
|
R99
|
|
Revised to S2-001553. Handled by QoS drafting group.: revised to S2-001553.
|
6QoS
|
S2-001498
|
Motorola
|
Informational content on clause 6.2
|
23.107
|
027
|
|
R99
|
|
Handled by QoS drafting group.
|
6QoS
|
S2-001499
|
Motorola
|
Requirements clarifications
|
23.107
|
028
|
|
R99
|
|
Revised to S2-001557. Handled by QoS drafting group.
|
6QoS
|
S2-001500
|
Motorola
|
Traffic class editorial corrections
|
23.107
|
029
|
|
R99
|
|
Revised to S2-001559. Handled by QoS drafting group.
|
6LCS
|
S2-001501
|
NTT DoCoMo
|
Proposed Work schedule for Location Service
|
|
|
|
|
|
Handled by LCS drafting group. Taken into account in the revised version of the work plan.
|
7
|
S2-001502
|
Lucent
|
Title of 23.121
|
23.121
|
|
|
|
None
|
Approved.
|
3
|
S2-001503
|
Nortel
|
Related to LS in 1383
|
|
|
|
|
|
Not handled.
|
5.2
|
S2-001504
|
Nortel
|
- not provided -
|
|
|
|
|
|
For Call flow drafting group.
|
3
|
S2-001505
|
Nortel
|
Related to LS in 1389
|
|
|
|
|
|
Proposed answer to S2-001389 and 1383 (taking into account this tdoc) in S2-001551. Handled by QoS drafting group.
|
|
S2-001506
|
Siemens
|
Withdrawn
|
|
|
|
|
|
|
5.1
|
S2-001507
|
Motorola
|
Withdrawn, replaced by 1541
|
|
|
|
|
|
|
5.1
|
S2-001508
|
Motorola
|
Serving CSCF Selection Registration Flows
|
|
|
|
|
|
Handled by the drafting group on Registration.
|
5.2
|
S2-001509
|
Motorola
|
Roles of CSCF and SIP versions
|
|
|
|
|
|
No version number of SIP should be defined by S2.
Concerning the roles, it was said that the flows have to be provided first, and then the exact wording can be found. But the OK with the rough lines.
To be revised to S2-001604.
|
5.2
|
S2-001510
|
Motorola
|
- not provided -
|
|
|
|
|
|
For Call flow drafting group.
|
6QoS
|
S2-001511
|
Motorola
|
Streaming delay
|
|
|
|
|
|
Noted. Handled by QoS drafting group.
|
4
|
S2-001512
|
Alcatel
|
Correction to Data Retrieve protocol stacks endpoints
|
23.121
|
059r1
|
|
R99
|
|
Revised to S2-001537.
|
5.3
|
S2-001513
|
Alcatel
|
Correction to Data Retrieve protocol stacks endpoints
|
23.121
|
060r1
|
|
R00
|
|
Revised to S2-001538.
|
4
|
S2-001514
|
Motorola
|
Suspend at UMTS to GSM inter-system change during a CS connection
|
23.060
|
181
|
F
|
R99
|
|
Not approved. Revised to S2-001534.
|
|
S2-001515
|
(drafting group) S2
|
|
|
|
|
|
|
|
3
|
S2-001515
|
BT
|
proposed response to Liaison Statement on IPT Basic Call Handling
|
LS out
|
|
|
|
9/15/00 (Steve, Ericsson): Revisions to 1st para.
|
Approved (with 1st paragraph modified).
|
|
S2-001516
|
S2
|
RAB Assignment QoS
|
LS out
|
|
|
|
9/15/00 (Laurent Thiebaut, Alcatel): Objection
|
Not approved.
|
4
|
S2-001517
|
Motorola
|
Removal of PDP type OSP:IHOSS in R99
|
23.060
|
182
|
F
|
R99
|
|
To be revised to S2-001536.
The corresponding CR on 03.60 is in S2-001535.
|
3
|
S2-001518
|
Nokia
|
LS response to S1, N3 on Service Modification without pre-notification”
|
|
|
|
|
|
Approved.
|
3
|
S2-001519
|
Nokia (Marc)
|
reply to LS on progress of real-time PS domain SRNS relocation"
|
LS out
|
|
|
|
9/15/00 (Laurent Thiebaut, Alcatel): Revisions to the last section.
9/15/00 (Juan-Antonio Ibanez, Ericsson): Concern
|
Not approved.
|
3
|
S2-001520
|
Vodafone (Chris)
|
Re-establishment Capability for Emergency call
|
LS out
|
|
|
|
9/14/00 (Naoki Tani, NTT DoCoMo): Revisions
9/15/00 (Chris Pudney, Vodafone): Revisions
9/15/00 (Naoki Tani, NTT DoCoMo): Response to Chris
|
Not approved.
|
3
|
S2-001521
|
Nokia
|
Correction to the relocation procedure
|
23.060
|
183
|
F
|
R99
|
9/15/00 (Liz Daniel, Lucent Technologies): Question
9/18/00 (Laurent Thiebaut, Alcatel): Revisions
9/19/00 (Nicolas Drevon, Alcatel): Support for Laurant
9/20/00 (Liz Daniel, Lucent Technologies): Comments
|
Not approved.
|
3
|
S2-001522
|
Nokia
|
Proposed Response to LS (R2-001859) on Corrections to relocation procedures in 23.060
|
LS out (related to CR 183)
|
|
|
|
9/20/00 (Liz Daniel, Lucent Technologies): Comments
|
Not approved.
|
4
|
S2-001523
|
Vodafone
|
DTM: reuse of the GPRS Suspension procedure in cells with no DTM capabilities
|
23.060
|
171r1
|
F
|
R99
|
|
Approved.
|
4
|
S2-001524
|
Vodafone
|
DTM: download of the IMSI from the SGSN to the BSC
|
23.060
|
172r1
|
F
|
R99
|
|
Approved.
|
3
|
S2-001525
|
GERAN
|
LS on 23.060 Change Requests for Dual Transfer Mode
|
|
|
|
|
|
See conclusion on the CRs themselves in the two following tdocs.
|
|
S2-001526
|
TSG-SA WG2
|
Response to LS (R2-001817) on Directed signalling connection re-establishment at RRC
|
LS out
|
|
|
|
None
|
Approved.
|
|
S2-001527
|
|
Response to LS in S2-001425.
|
|
|
|
|
|
For e-mail approval.
|
|
S2-001528
|
Lucent
|
Answer to Proposal of exchange of the terms “in GSM“ and “in UMTS“
|
LS out
|
|
|
|
None
|
Approved.
|
|
S2-001529
|
Nokia
|
LS on Failure during SRNS Relocation
|
LS out
|
|
|
|
None
|
Approved.
|
|
S2-001530
|
Alcatel
|
Detailed on Camel interworking with SGSN (SGSN CAMEL procedures)
|
|
|
|
|
|
Approved.
|
|
S2-001531
|
Siemens
|
Compatibility GTPv0/GTPv1 in case of SGSN change
|
23.060
|
177r1
|
F
|
R99
|
|
Approved.
|
4
|
S2-001532
|
Ericsson
|
Serving RNS Relocation Procedure
|
23.060
|
175r1
|
F
|
R99
|
|
Approved.
|
4
|
S2-001533
|
Ericsson
|
DRX and MS network capabilities within UMTS
|
23.060
|
176r1
|
F
|
R99
|
|
Approved.
|
|
S2-001534
|
Motorola
|
Suspend at UMTS to GSM intersystem change during a CS connection
|
CR to 23.060
|
|
|
|
|
|
4
|
S2-001534
|
Motorola
|
Suspend at UMTS to GSM inter-system change during a CS connection
|
23.060
|
181r1
|
F
|
R99
|
9/15/00 (Frank Mademann, Siemens): Objection
9/16/00 (Andrew Delecki, Motorola Canada): Withdrawn
|
Withdrawn.
|
4
|
S2-001535
|
Motorola
|
Removal of PDP type OSP:IHOSS in R99
|
03.60
|
A188
|
F
|
R98
|
None
|
Approved.
|
4
|
S2-001536
|
Motorola
|
Removal of PDP type OSP:IHOSS in R99
|
23.060
|
182r1
|
F
|
R99
|
None
|
Approved.
|
4
|
S2-001537
|
Alcatel
|
Correction to Data Retrieve protocol stacks endpoints
|
23.121
|
059r1r1
|
|
R99
|
None
|
Approved.
|
5.3
|
S2-001538
|
Alcatel
|
Correction to Data Retrieve protocol stacks endpoints
|
23.121
|
060r2
|
|
R00
|
None
|
Approved.
|
6qos
|
S2-001539
|
AT&T
|
QoS optionality
|
|
|
|
|
|
Not approved. Handled by QoS drafting group.
|
5.1
|
S2-001540
|
AT&T
|
Multiple I-CSCF
|
|
|
|
|
|
Approved.
|
5.1
|
S2-001541
|
Motorola Inc, Nortel Networks, Siemens, Alcatel, T-Mobil
|
Serving CSCF Selection
|
|
|
|
|
|
Not approved. Handled by the drafting group on Registration.
|
5.1
|
S2-001542
|
AT&T
|
Registration functionality
|
|
|
|
|
|
Handled by the drafting group on Registration.
|
|
S2-001543
|
Motorola
|
IP v6 address stateless autoconfiguration
|
23.060
|
180r1
|
F
|
R99
|
|
Not handled.
|
|
S2-001544
|
3Com
|
Removing Proxy CSCF from signalling path
|
|
|
|
|
|
Withdrawn
|
|
S2-001545
|
3Com
|
CSCF definitions
|
|
|
|
|
|
Withdrawn
|
|
S2-001546
|
3Com
|
Registration call flows
|
|
|
|
|
|
Handled by Call Flow drafting group.
|
5.1
|
S2-001547
|
Drafting group
|
Output of the drafting on registration
|
|
|
|
|
|
Noted. The result is proposed to be incorporated in 23.228 as shown in S2-001616.
|
6 OSA
|
S2-001548
|
OSA drafting
|
Support of services for roaming users
|
|
|
|
|
|
Approved.
|
6 OSA
|
S2-001549
|
Alcatel
|
Discovery of local services in Visited Network
|
|
|
|
|
|
Not approved. Postponed to the next OSA drafting.
|
|
S2-001550
|
Ericsson
|
QoS End-to-End Functional Architecture
|
23.107
|
|
|
R00
|
|
Revised to S2-001560. For QoS drafting.
|
|
S2-001551
|
QoS related
|
|
|
|
|
|
|
Editorially revised to S2-001651.
|
|
S2-001552
|
QoS related
|
|
|
|
|
|
|
|
6qos
|
S2-001553
|
Motorola
|
Attribute and parameter
|
23.107
|
026r1
|
|
R99
|
|
Revised to S2-001562 (CR for R99) and S2-001554 (CR for R00). For QoS drafting group
|
6qos
|
S2-001554
|
Motorola
|
Attribute and parameter
|
23.107
|
032
|
|
R00
|
|
Not approved: no need yet to raise 23.107 to v.4.
|
6qos
|
S2-001555
|
Motorola
|
Informational content in clause 6.2
|
23.107
|
027r1
|
|
R99
|
|
Approved.
|
6qos
|
S2-001556
|
Motorola
|
Informational content in clause 6.2
|
23.107
|
031
|
|
R00
|
|
Not approved: no need yet to raise 23.107 to v.4.
|
|
S2-001557
|
Motorola
|
Requirements Clarifications
|
Tdoc
|
|
|
|
|
|
6qos
|
S2-001557
|
Motorola
|
Requirements clarifications
|
|
|
|
|
9/15/00 (Keith Drage, Lucent Technologies): Objection
9/15/00 (Dave Hetherington, Motorola): Proposed revisions.
9/18/00 (Keith Drage, Lucent Technologies): Support for Dave
9/21/00 (Dave Hetherington, Motorola): 1557 Rev1
|
Approved
(1557 Rev1)
|
|
S2-001558
|
QoS related
|
|
|
|
|
|
|
|
6qos
|
S2-001559
|
Motorola
|
Traffic class editorial corrections
|
23.107
|
029r1
|
|
R99
|
|
Revised to S2-001563 (R99)and S2-001564 (R00)
|
|
S2-001560
|
Ericsson
|
QoS End-to-End Functional Architecture
|
23.107
|
|
|
R00
|
|
Revised to S2-001561.
|
|
S2-001561
|
Ericsson
|
QoS End-to-End Functional Architecture
|
23.107
|
023r1
|
|
R00
|
|
Not approved: S2 approved the CR from a technical point of view (excluding the technical notes). However, it cannot be approved officially because it is adding too many editorial notes: once a document is in version 3 or above, it cannot contain so many unstable sections as proposed here.
Companies are asked to contribute on the basis of this CR: the S2 intention is to solve all the editorial notes as soon as possible so that the CR can be officially approved.
All the CRs on R00 are not approved, because there is no need to create a Release 2000 version right now because CR023r1 was not approved.
|
6qos
|
S2-001562
|
Motorola
|
Attribute and parameter
|
23.107
|
026r2
|
|
R99
|
|
Approved.
|
6qos
|
S2-001563
|
Motorola
|
Traffic class editorial corrections
|
23.107
|
029r2
|
|
R99
|
|
Approved.
|
6qos
|
S2-001564
|
Motorola
|
Traffic class editorial corrections
|
23.107
|
030
|
|
R00
|
|
Not approved: no need yet to raise 23.107 to v.4.
|
|
S2-001565
|
QoS Convenor
|
Minutes of the drafting meeting on QoS
|
|
|
|
|
|
Noted. See individual conclusions bellow.
|
|
S2-001566
|
SA2
|
LS answer to S2-001566
|
|
|
|
|
|
Approved.
|
|
S2-001567
|
- 1567 to 1599: not allocated -
|
|
|
|
|
|
|
|
5.2
|
S2-001600
|
Ericsson
|
Single MS ISDN
|
|
|
|
|
|
|
5.3
|
S2-001601
|
Nokia
|
Release 2000 Specific Ipv4/Ipv6 Transition Scenarios
|
|
|
|
|
|
See conclusion in next tdoc.
|
5.2
|
S2-001602
|
Telia
|
Requirement for handling ungraceful session termination in the IM domain
|
|
|
|
|
|
Approved.
|
5.2
|
S2-001603
|
Telia
|
Ungraceful session termination in the IM domain
|
LS out (to CN1)
|
|
|
|
None
|
Approved.
|
5.2
|
S2-001604
|
Motorola
|
|
|
|
|
|
9/21/00 (Romeo Zwart, AT&T): Revised version (1604 Rev1)
9/21/00 (Jie Feng, 3Com Corporation): Revisions to 1604 Rev1
9/22/00 (Romeo Zwart, AT&T): Response to Jie
9/22/00 (Shabnam Sultana, Ericsson): 1604 Rev2
9/22/00 (Laurent Thiebaut, Alcatel): 1604 Rev3
9/22/00 (Susanna Kallio, Nokia): Proposed deletion of a sentence
9/22/00 (Laurent Thiebaut, Alcatel): Support for Susanna
9/25/00 (Nicholas Allen, Nortel Networks): Proposed removal of a bullet item
9/25/00 (Charles Kalmanek, AT&T): Support for Nik
9/25/00 (Shabnam Sultana, Ericsson): 1604 rev4
9/26/00 (Romeo Zwart, AT&T): Support for 1604 rev4
9/28/00 (Nicholas Allen, Nortel Networks): Proposed modifications
9/28/00 (Susanna Kallio, Nokia): Proposed deletion of a sentence
9/28/00 (Shabnam Sultana, Ericsson): 1604 Rev5
9/28/00 (Romeo Zwart, AT&T): Response to Nik
9/28/00 (Bill Marshall, AT&T): Comments to Nik
9/28/00 (Thomas T Towle, AT&T): Proposed modifications
9/29/00 (Magnus & Shabnam): Proposed way forward on 1604 Rev5
9/29/00 (Jie Feng, 3COM Corporation): Comments to 1604 R5
|
Not approved.
|
6 OSA
|
S2-001605
|
OSA drafting
|
Service Control Interface Protocols
|
|
|
|
|
|
Approved.
|
5.1
|
S2-001606
|
Ericsson, Motorola, Lucent, AT&T
|
Registration procedures
|
|
|
|
|
|
Revised to S2-001610.
|
4
|
S2-001607
|
NTT
|
Correction on Iu Release Procedure
|
23.060
|
178r1
|
F
|
R99
|
|
Approved, revised to S2-001654 because of an editorial error.
|
5
|
S2-001608
|
NTT
|
Response to LS on Architectural Impact of Combined MAP Signaling for Mobility Management
|
LS out (to CN4, cc CN)
|
|
|
|
9/12/00 (Naoki Tani, NTT DoCoMo): Objection to a reference.
9/15/00 (Jonne Soininen, Nokia): Revisions and support for the reference.
9/15/00 (Laurent Thiebaut, Alcatel): Revisions
9/15/00 (Nobuyuki Uda, NTT Comware): Support to Naoki Tani.
|
Not approved.
|
3
|
S2-001609
|
G00-0374
|
LS on inter-BSC hard handover in GERAN for the packet switched domain
|
|
|
|
|
|
See conclusions of S2-001397.
|
5.1
|
S2-001610
|
Ericsson
|
Registration procedures
|
|
|
|
|
|
Editorially revised to S2-001618. The text has to be moved in the main body of 23.228 in S2-001618.
|
|
S2-001611
|
Siemens, Mannesmann
|
Multimedia messaging architecture
|
|
|
|
|
|
Proposed LS to T2 in S2-001631.
|
5
|
S2-001612
|
Vodafone
|
Initial thoughts on GERAN impacts on overall system architecture
|
|
|
|
|
|
LS generated on this basis in S2-001615.
|
5
|
S2-001613
|
Alcatel
|
Draft LS to GERAN (Cc R2, R3) on inter-BSC hard handover in GERAN for the packet switched domain
|
|
|
|
|
|
Editorially revised to S2-001637.
|
5
|
S2-001614
|
AT&T
|
PS Domain Multiple RABs Real Time Handover Requirements
|
LS out
|
|
|
|
9/15/00 (Frank Mademann, Siemens): Withdrawn.
|
Withdrawn.
|
5
|
S2-001615
|
Vodafone
|
Draft LS on GERAN impacts on overall system architecture
|
LS out (to GERAN, CN1,2,4)
|
|
|
|
None.
|
Approved.
|
5.1
|
S2-001616
|
AT&T
|
Text for 23.228 from drafting session on S-CSCF Selection
|
|
|
|
|
|
Editorially revised to S2-001635.
|
6LCS
|
S2-001617
|
Nokia
|
LCS agenda
|
|
|
|
|
|
Handled by LCS drafting group.
|
5.1
|
S2-001618
|
Ericsson
|
Registration procedures
|
|
|
|
|
|
Approved.
|
6
|
S2-001619
|
OSA drafting
|
Support of services for roaming users (2)
|
|
|
|
|
|
Approved.
|
5.2
|
S2-001620
|
AT&T
|
Annex B.1 update
|
|
|
|
|
|
|
5.2
|
S2-001621
|
AT&T
|
Call Flows
|
|
|
|
|
|
|
6 OSA
|
S2-001622
|
OSA
|
Discovery of local services in Visited Network
|
23.127
|
|
|
|
|
Revised to S2-001549.
|
6 OSA
|
S2-001623
|
OSA
|
Minutes of the OSA drafting group of Bristol
|
23.127
|
|
|
|
|
Approved. This report asks for approval of the following tdocs: S2-001548, S2-001619, S2-001605, S2-001634, S2-001624, S2-001625, S2-001626, S2-001627, S2-001628, S2-001629, S2-001630
|
6 OSA
|
S2-001624
|
Siemens
|
CR on Parlay-OSA alignment: basic service interface
|
23.127
|
012
|
F
|
R99
|
|
Approved.
|
6 OSA
|
S2-001625
|
Siemens
|
CR on Parlay-OSA alignment: initial contact interfaces
|
23.127
|
013
|
F
|
R99
|
|
Approved.
|
6 OSA
|
S2-001626
|
Siemens
|
CR on Parlay-OSA alignment : access SCF
|
23.127
|
014
|
F
|
R99
|
|
Approved.
|
6 OSA
|
S2-001627
|
Siemens
|
CR on Parlay-OSA alignment: load manager SCF
|
23.127
|
015
|
F
|
R99
|
|
Approved.
|
6 OSA
|
S2-001628
|
Siemens
|
CR on Parlay-OSA alignment: fault manager SCF
|
23.127
|
016
|
F
|
R99
|
|
Approved.
|
6 OSA
|
S2-001629
|
Siemens
|
CR on Parlay-OSA alignment: service factory SCF
|
23.127
|
017
|
F
|
R99
|
|
Approved.
|
6 OSA
|
S2-001630
|
Siemens
|
CR on Parlay-OSA alignment: authentication interface
|
23.127
|
018
|
F
|
R99
|
|
Approved.
|
|
S2-001631
|
Mannesmann
|
Address Translation in MMS R’00
|
LS out (to T2)
|
|
|
|
None.
|
Approved.
|
|
S2-001632
|
Siemens
|
CSCF Availability during the SIP Session
|
|
|
|
|
|
Not approved.
|
|
S2-001633
|
Nokia
|
Role of the proxy CSCF after the registration procedure
|
|
|
|
|
|
Approved.
|
6 OSA
|
S2-001634
|
Ericsson
|
Change of TS 23.127 title for version 4.0 and up
|
23.127
|
011r1
|
D
|
R00
|
|
Approved.
|
|
S2-001635
|
SA2
|
Text for 23.228 from drafting session on S-CSCF Selection
|
|
|
|
|
|
Approved.
|
|
S2-001636
|
Drafting group on Call Flows
|
Result of the drafting on call flows.
|
|
|
|
|
9/16/00 (Andrew Allen, Motorola): Editorials
9/21/00 (Bill Marshall, AT&T): 1636 r2
9/22/00 (Susanna Kallio, Nokia): Request for changes to 1636 r2
9/22/00 (Laurent Thiebaut, Alcatel): Support for Susanna
9/22/00 (Romeo Zwart, AT&T): Support for Susanna
9/22/00 (Bill Marshal, AT&T): Response to Susanna
9/23/00 (Nicholas Allen, Nortel Networks): Clarification request on Annex B
9/23/00 (Bill Marshal): Response to Nik
|
Approved(1636 r2 with possible revision).
|
|
S2-001637
|
SA2
|
LS to GERAN and R3 (Cc R2) on inter-BSC hard handover in GERAN for the packet switched domain
|
|
|
|
|
|
Approved.
|
|
S2-001638
|
N1-000973
|
LS on UMTS Service Request procedure
|
23.060
|
184
|
F
|
R99
|
9/15/00 (Laurent Thiebaut, Alcatel): Comments.
9/15/00 (Frank Mademann, Siemens): Comments.
|
N1 CR to 23.060 contained in this LS was approved.
|
6
|
S2-001639
|
SA2
|
LS to S1 (Cc N5) on terminology in OSA specifications
|
|
|
|
|
|
Approved.
|
|
S2-001640
|
Drafting on Split GSN
|
Minutes of the drafting group
|
|
|
|
|
|
Revised to S2-001655.
Previous version of 23.873 is in S2-001378.
The next ad-hoc meeting is proposed to take place in Vancouver, hosted by Motorola, 17th to 19th of October.
|
|
S2-001641
|
Nokia
|
Many to many relationship on Iu interface
|
23.121
|
061
|
B
|
R00
|
9/15/00 (Frank Mademann, Siemens): Objection
|
Not approved.
|
|
S2-001642
|
MCC
|
Other term to refer to RAN+SGSN+GGSN
|
|
|
|
|
See S2-001450
|
See S2-1450
Not approved.
|
5.3
|
S2-001643
|
Motorola
|
IP Address Management
|
|
|
|
|
9/19/00 (Bill Marshall, AT&T): Revisions
9/19/00 (Bonnie Chen, Motorola): Response to Bill
9/20/00 (Liz Daniel, Lucent Technologies): Response to Bill
9/21/00 (Bill Marshall, AT&T): Withdrawal
9/21/00 (Shabnam Sultana, Ericsson): 1643 Rev1
9/22/00 (Bonnie Chen, Motorola): Agreement with Shabnam
|
Approved
(1643 Rev1)
|
|
S2-001644
|
Nokia
|
Communication between the core and access networks
|
23.171
|
?
|
|
|
|
Editorially revised to S2-001656.
|
|
S2-001645
|
LCS convenor
|
Meeting report of the S2 LCS drafting session 7.9.2000
|
|
|
|
|
|
Noted. See individual conclusions on the tdocs handled by this drafting.
|
|
S2-001646
|
LCS
|
LS to R2 (Cc S1, R3) regarding an open interface between the SMLC and the SRNC within the UTRAN for LCS Support
|
LS out (to RAN2, cc SA1, RAN3
|
|
|
|
9/15/00 (Magnus Olsson, Ericsson): Objection
9/15/00 (Laurent Thiebaut, Alcatel): Objection
9/15/00 (Brendan Ludden, Vodafone): Support
9/16/00 (Len Sheynblat, A Qualcomm Company): Support
9/18/00 (Laurent Thiebaut, Alcatel): Objection
9/18/00 (Enrico De Luca, Ericsson): Objection
9/20/00 (Len Sheynblat, A Qualcomm Company): Rebuttal and request for extending deadline
9/20/00 (Liz Daniel, Lucent Technologies): Support for extending deadline
9/20/00 (Laurent Thiebaut, Alcatel): Objection
9/22/00 (Michele Zarri, One 2 One): Comments on UE definition
9/28/00 (Len Sheynblat, A Qualcomm Company): Response to Laurant
9/29/00 (Laurent Thiebaut, Alcatel): Objection
|
Not approved.For e-mail approval.
To be approved by e-mail by 18th September because some companies had already left the meeting when the LS was presented!
This process is accepted as an exceptional case.
|
|
S2-001647
|
NTT
|
Current status and work plan for the feasibility study of an architecture for push service
|
|
|
|
|
|
Approved in principle, but the version of the TR will depend of the content of the TR itself.
|
|
S2-001648
|
NTT
|
Proposed change to WI: A feasibility study of an architecture for network requested PDP context activation with User-ID
|
|
|
|
|
|
Revised to S2-001660.
|
|
S2-001649
|
NTT
|
23.874 v.0.0.3 on Push services
|
23.874
|
|
|
|
|
Raised in v.1 in S2-001659.
|
|
S2-001650
|
NTT
|
Invitation for S2#15
|
|
|
|
|
|
Noted.
|
|
S2-001651
|
SA2
|
Response LS on RAB Assignment QoS Negotiation
|
LS out (to RAN3, cc CN 1,4)
|
|
|
|
9/15/00 (Chuk Kalmanek): Concerns
|
Approved.
|
|
S2-001652
|
Editor
|
23.873 v.0.2.0: Feasibility Study for Transport and Control Separation in the PS CN Domai
|
|
|
|
|
9/15/00 (Jie Feng, 3Com Corporation): Questions
9/15/00 (Juan-Antonio Ibanez, Ericssion): Answers.
|
Approved.
|
|
S2-001653
|
Ericsson
|
LS on Cellular Text telephone Modem approval from T1P1.3
|
|
|
|
|
|
Not handled.
|
|
S2-001654
|
NTT
|
Correction on Iu Release Procedure
|
23.060
|
178r1
|
F
|
R99
|
|
Approved.
|
|
S2-001655
|
Split archi convenor
|
|
|
|
|
|
|
Approved (to be sent by e-mail).
|
|
S2-001656
|
Nokia
|
Communication between the core and access networks
|
23.171
|
004
|
D
|
R99
|
9/15/00 (Laurent Thiebaut, Alcatel): Revisions.
9/15/00 (Liz Daniel, Lucent Technologies): Comments on a reference.
|
Not approved.
|
|
S2-001657
|
Editor
|
23.271 v.0.2.2
|
|
|
|
|
9/14/00 (Amarjit Deol, Nortel Networks): Comments.
9/15/00 (Jan Kall, Nokia): Revised version.
9/15/00 (Liz Daniel, Lucent Technologies): Comments to scope.
9/18/00 (Laurent Thiebaut, Alcatel): Comments
9/19/00 (Jan Kall, Nokia): Response to Laurant
9/20/00 (Laurent Thiebaut, Alcatel): Withdrawal
9/20/00 (Jan Kall, Nokia): Revised version (23.271 v.0.2.2)
|
Approved For e-mail approval. To be presented to SA in version 1. To be sent by e-mail on 11th, deadline for comment 15th.
|
|
S2-001658
|
N4-000713
|
LS on SRNS relocation based on global title
|
|
|
|
|
|
Proposed answer in S2-001658. Linked with S2-001469. Proposed answer in S2-001661
|
|
S2-001659
|
NTT
|
23.874 v.1.0.0 on Push services
|
23.874
|
|
|
|
|
Approved. To be presented to SA#9.
|
|
S2-001660
|
NTT
|
Proposed change to WI: A feasibility study of an architecture for network requested PDP context activation with User-ID
|
|
|
|
|
|
Approved. To be presented to SA#9.
|
|
S2-001661
|
Ericsson
|
LS, SRNS relocation based on global title
|
LS out (to CN1)
|
|
|
|
|
Not approved.
|
|
S2-001662
|
Ericsson
|
Proposed answer to S2-001384 on Terminology of TrFO/TFO and possible interworking scenarios
|
LS out (to CN1)
|
|
|
|
9/20/00 (Alexander Milinski): Revised version (1662 R1)
9/20/00 (Stephen Terril, Ericsson): Response to Alexander (1662 R3)
9/20/00 (Prem Tirilok, Tellabs): Proposal of cc to SA4
9/21/00 (Stephen Terril, Ericsson): Support for Prem
9/25/00 (Stephen Terril, Ericsson): 1662 R4
|
Approved
(1662 R4)
|
|
S2-001663
|
Nortel
|
|
|
|
|
|
|
|