Minutes of the S2 meeting #14 4th to 8th of September 2000 Bristol, uk


Split Architecture drafting group



Yüklə 2,33 Mb.
səhifə58/63
tarix03.01.2022
ölçüsü2,33 Mb.
#35593
1   ...   55   56   57   58   59   60   61   62   63

5.6Split Architecture drafting group


S2-001377 from WI rapporteur (Ericsson): Minutes of Split Architecture Drafting in Stockholm (on 23.873)

Conclusion: For SGSN split drafting group.
S2-001640 from Drafting on Split GSN: Minutes of the drafting group

The meeting, however, turned out to be dedicated to general aspects only, as these were handled first, leaving no time for starting the work on basic signalling flows. It was nevertheless a constructive meeting as the contributions handled have generally contributed to identifying valid points to be considered in the study. We can consider that a solid base is now settled for starting the detailed work on the different alternatives at the next drafting meeting.



Discussion: In the text on S2S-000031, the last paragraph of the first “discussion” section reflects off-line discussions and convenor’s opinion: this has to be deleted.

Also the first bullet point of the conclusion has to be deleted.

The conclusion on this document is finally that it is not approved for inclusion in next version.

Conclusion: Revised to S2-001655.

Previous version of 23.873 is in S2-001378.

The next ad-hoc meeting is proposed to take place in Vancouver, hosted by Motorola, 17th to 19th of October.
S2-001655 from Split archi convenor:

Revision of S2-001640.




Yüklə 2,33 Mb.

Dostları ilə paylaş:
1   ...   55   56   57   58   59   60   61   62   63




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin